Laserfiche WebLink
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 22-+6622 <br /> DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION <br /> Item Description Qty Unit Unit Price Amount <br /> 16 Install Shoring for Underground Storage 7,865 SF $ <br /> 50-00 393,250.00 <br /> Reservoirs <br /> 17 Install 8"SDR35 PVC Pipe Incl. 151 LF $ 5 <br /> Trenching, Removals,Bedding,and 355,00 55,115.00 <br /> Backfill <br /> 18 Install IS"DLP(CL250) Incl.Trenching, 47 LF $ $ <br /> Removals, Bedding,Back Pill,and 535.00 25,145.00 <br /> Pavement Replacement <br /> 19 Install 18"RCP(2500-D)Incl.Trenching, 367 LF $ $ <br /> Removals,Bedding,Backfill,and 460.00 168,820.00 <br /> Pavement Replacement <br /> 20 Install 21"RCP(2000-D)Incl.Trenching, 10 LF $ $ <br /> Removals, Bedding,Backfill,and 490_00 4,900.00 <br /> Pavement Replacement <br /> 21 Install 24"RCP(2000-D)Incl.Trenching, 102 LF $ $ <br /> Removals, Bedding, Backfill,and 520.00 53,040.00 <br /> Pavement Replacement <br /> 22 Install 36"RCP(2000-D)Incl.Trenching, 310 LF $ $ <br /> Removals, Bedding, Backfill,and 590.00 182,900.00 <br /> Pavement Replacement <br /> 23 Insta[]36"RCP(2000-D)Incl.Trenching, 295 LF $ $ <br /> Removals, Bedding,Back-Fill,and 675.00 199,125.00 <br /> Pavement Replacement <br /> 24 Install 39"RCP(2000-D)Incl.Trenching, 10 LF $ $ <br /> Removals, Bedding, Backfill,and 540.00 5,400.00 <br /> Pavement Replacement <br /> 25 Construct Concrete Collar 8 EA $ $ <br /> 3,000.00 24,000.00 <br /> 26 Construct Junction Structure Per SPPWC I EA $ $ <br /> Sid. Plan 331-3 5,000.00 5,000.00 <br /> 27 Construct Type A Junction Chamber Incl. 5 EA $ $ <br /> Excavation.Removals,Backfill,and 22,500,00 112,500.00 <br /> Pavement Replacement <br /> 28 Construct Type B Junction Chamber Incl. 1 EA $ $ <br /> Excavation,Removals,Backfill,and 25,000M 25,000.00 <br /> Pavement Replacement <br /> 29 Construct Low Flow Diversion Vault Incl. 1 EA S $ <br /> Excavation. 'Removals,Backfill,and 21,500.00 21,500.00 <br /> Pavement Re lacement <br /> 30 Construct Low Flaw Diversion lull-I Incl. I EA $ S <br /> Excavation, Removals,Backfill,and 22,500,00 22.500.00 <br /> Pavement Replacement <br /> 31 Install 18"X l8"Grated Catch Basin with 2 EA <br /> Catch Basin Filter Insert(Qldcastle 15,000.00 <br /> FloGard or approved equal)Incl. 7,500`QD <br /> Excavation. Removals,and Backfill <br /> 32 Install 18"xl8"Grated Catch Basin Air 2 EA S S <br /> Vent with Catch Basin Filter Insert <br /> (01dcastle F1oGard or approved equal) 7,500.00 15,000.00 <br /> Incl. hrcI. Excavation, Removals,and <br /> Backfill <br /> P-2 of P-19 <br />