My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GMZ ENGINEERING, INC. (DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GMZ ENGINEERING, INC. (DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2024 10:01:36 AM
Creation date
4/6/2023 2:57:29 PM
Metadata
Fields
Template:
Contracts
Company Name
GMZ ENGINEERING, INC.
Contract #
P 22-6622
Agency
Public Works
Council Approval Date
3/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.:22-6622 <br /> DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION <br /> TOTAL ]SASE BID 44,458,844.00 <br /> TOTAL ADD ALTERNATE BID S 183,800.00 <br /> The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br /> right to award the Base Bid,and any, all, or none of the add-alternate bid items (if any). <br /> The quantity 'for this bid item is shown for bid comparison only. This bid item shall not be <br /> subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br /> amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br /> right to increase or decrease the quantity of this item accordingly. <br /> *' Labor for planting all 1-gallon, 5-gallon, and 15-gallon Shrubs, Ornamental Grasses, and <br /> Ground Covers as shown per plan shalt be performed by the OCCC. The Contactor shall be <br /> responsible for planting all Trees as shown per plan. For the landscaping bid items, only the <br /> price to furnish the materials for the installation of the 1-gallon, 5-gallon, and I5-gallon <br /> planting shall be included. The labor far the OCCC installation work for l-, 5-,and. 15-gallon <br /> plants is included in Bid Item 59. <br /> This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br /> TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br /> The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br /> shown above, within 200 working days after the commencement date stated in the Notice to <br /> Proceed. <br /> The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br /> Standard Specifications, shall be $4,800 per calendar day. <br /> .Nameoffirm GMZ Engineering, Inc. <br /> Signature of BIDDER " <br /> Title Ghazi Mubarak - President. Vice President, Secretary. Treasurer <br /> (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of <br /> all individual co-partners composing the firm. If corporation, state legal name of corporation, <br /> and names of President, Secretary,Treasurer and Manager, thereof:) <br /> P-5 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.