My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUNBAR ARCHITECTURE DESIGN SERVICES
Clerk
>
Contracts / Agreements
>
D
>
DUNBAR ARCHITECTURE DESIGN SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:51:42 AM
Creation date
4/10/2023 1:25:48 PM
Metadata
Fields
Template:
Contracts
Company Name
DUNBAR ARCHITECTURE DESIGN SERVICES
Contract #
A-2023-044
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/21/2026
Insurance Exp Date
9/6/2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. West Entrance <br />i. Retrofit doors to match original design <br />ii. Clean up entrance building lettering, stone/brick, stucco and windows <br />iii. Replace walkway connecting west entrance to sidewalk on Cypress Ave. <br />iv. Create a patio area for outdoor activities for children and seniors <br />i. East Entrance <br />i. Create entrance for exclusive use by Police Department staff and officers. <br />Gate/fence must be open without police officer getting out of their vehicle. Must <br />be able to open gate/fence from their phone. <br />ii. Create parking area along east side of building exclusively for police officers <br />iii. Create access for police officers to their substation <br />j. Surveillance: Provide comprehensive exterior security cameras and necessary low <br />voltage cabling <br />k. IT/Wireless Service: Coordinate with IT to provide no low voltage cat 6 cabling/trays <br />throughout the building along with new access points <br />2. Interior <br />a. <br />General building <br />i. <br />All new building systems <br />ii. <br />Include technology in all new classrooms, open area and substation <br />iii. <br />New flooring throughout <br />iv. <br />New restrooms for patrons and staff; <br />v. <br />New restroom(s) exclusively for police officers <br />vi. <br />New lighting plan to ensure no shadows or dark areas <br />vii. <br />Replace all furniture in public and private spaces <br />viii. <br />New ceiling system <br />ix. <br />New HVAC, mechanical, electrical and plumbing <br />x. <br />Repair interior and exterior windows; and doors <br />xi. <br />Provide a comprehensive signage plan <br />xii. <br />ADA compliance/Accessible path of travel <br />b. <br />Open Community Area <br />i. <br />Front desk to check in <br />ii. <br />Open space with direct line of sight <br />iii. <br />Maintain high vaulted ceilings and one story <br />c. <br />Two New <br />Classrooms <br />i. <br />(1) Room dedicated for physical activities <br />ii. <br />(1) Room dedicated for arts but can transform for senior citizen classes <br />d. <br />Two New <br />Offices <br />i. <br />(1) New office for Director <br />ii. <br />(1) New office for Assistant Director <br />e. <br />New Police Substation <br />i. New office(s)/work space <br />ii. New Restroom <br />iii. New kitchen / break area <br />Original Floor Plans are included in this Request for Proposals as Attachment 4 <br />City of Santa Ana RFP 22-095 <br />Page A 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.