My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence - Non-Agenda
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Correspondence - Non-Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 2:38:45 PM
Creation date
4/12/2023 1:48:00 PM
Metadata
Fields
Template:
City Clerk
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOP Comments RE.Related Bristol Specific Plan <br /> April 17,2023 <br /> Page 2 of 4 <br /> 2 02 0.3 Roughly one year later(in response to City Planning Commission concerns),the City <br /> recirculated for a 45-day public review another 3-volume, 2,229-page Draft PEIR that incorporated <br /> the original Draft PEIR by reference.4 A Final PEIR was certified in April 2022,which was <br /> subsequently subject to a June 2022 PEIR"Addendum"to reflect changes associated with the <br /> Housing Element.5 <br /> Given that the PEIR is already thousands of pages contained in numerous volumes,6 Local <br /> 11 requests that the City provide a 65-day public comment review of the forthcoming SEIR-just as <br /> before.This is appropriate given the prior Draft PEIR received a similar comment period length and <br /> is necessary for the public and the City decision-making body to consider the SEIR in context of the <br /> previously adopted PEIR and Addendum. <br /> Second, the SEIR should consider the Proiect's consistency with greenhouse gas CGHG") and <br /> vehicle miles traveled C'VMT") assumptions under the PEIR, as well as newer applicable plans. For <br /> example,the PEIR found the Housing Element would not have a significant VMT impact,in part, <br /> because it was projected to generate 22.0 VMTs per service population. (PEIR,6 pp. 5.16-36.) <br /> Similarly,the PEIR found some GHG impacts to be less than significant because the development <br /> would achieve 3.5 MTCO2e per service population. (See PEIR,6 pp. 5.7-33.) The SEIR should analyze <br /> whether the Project will achieve these levels of VMT/GHG performance throughout the build out of <br /> the Specific Plan. <br /> Furthermore,the PEIR assumed the City would update its 2015 Climate Action Plan ("CAP") <br /> to substantially lessen significant GHG impacts. (See PEIR, pp. 5.7-37- 5.7-40.) However, it does not <br /> appear that the City has updated its 2015 CAP,which undermines the City's reliance on a <br /> supplemental EIR in lieu of a subsequent, project-specific EIR. The lack of an updated CAP must be <br /> adequately addressed. <br /> Third, the SEIR should consider new applicable plans affecting air quality and GHG emissions. <br /> The PEIR's air quality and GHG analysis relied on various plans prepared by the California Air <br /> Resources Board ("CARB"), South Coast Air Quality Management District("SCAQMD"), and the <br /> Southern California Association of Governments ("SCAG"). (Id., 5.7-9, 5.7-12, 5.7-35 [referencing <br /> CARB's 2017 Scoping Plan, SCAG's 2020 RTP/SCS]; see also PEIR,6 pp.5.2-10 [referencing <br /> SCAQMD's 2016 AQMP].) However,these and other relevant plans have been and/or in the process <br /> 3 See OPR,Santa Ana General Plan Draft Program Environmental Impact Report,https://ceganet.opr.ca.gov/ <br /> 2020029087/3;see also Notice of Availability("NOA") (8/3/2020),p.1,https://files.ceganetopr.ca.gov/ <br /> 2 59509-3/attachment/rPOG9KVMv9 FuVohMGyOWRhQDMDTtUcCC4nTHY9ggeIBGjOiLN4PzOvvfQtWWv <br /> UngNgOwQFgvjVoyAxIxO;see also NOA,infra fn.4. <br /> 4 See OPR,Santa Ana General Plan Update Recirculated Draft Program Environmental Impact Report, <br /> https://ceganet.opr.ca.gov/2020029087/4;see also NOA(8/6/2021),pp.2-3,https://files.ceganet.opr.ca <br /> .gov/2 595 09-4/attachment/fN QOgJ LxLO mSQZHS neSMgZYCOdYbN4PJGdJ-y7 RuvLj Vx9 HeHfbJ <br /> FA9 7y1b414ogL7vBtFN1B0 RQRI6_0. <br /> 5 See Notice of Determination(signed 4/20/2022),https://files.ceqanet.opr.ca.gov/259509- <br /> 5/attachment/RNYUgTODtWU4xw77VnOS1ZXiOOGosufGgyONdJtapVxro2 L4ehNyXmHGuarrReO2 3jbfQG3 MPJ <br /> LvTSYQO;see also Addendum(Jun.2022),p.1,https://storage.googleapis.com/proudcity/ <br /> santaanaca/uploads/2022/07/Santa-Ana-Housing-Element_Addendum_June_202 2.pdf. <br /> 6 https://www.santa-ana.org/general-plan-environmental-documents/. <br />
The URL can be used to link to this page
Your browser does not support the video tag.