Laserfiche WebLink
CITY OF SANTA ANA <br />fit with corner joints coped or mitered and in true alignment. Built-up parts shall be free of warp. <br />Exposed ends and edges of metal shall be slightly rounded. Fastenings shall be concealed whenever <br />possible. <br />Post Spacing Requirements: <br />Span <br />'Nominal (71-3/8" Rail) <br />Nominal (91-1/4" Rail) <br />Post Size <br />-1/2" <br />2-1/2" " <br />1/2" 1/2" " <br />Bracket Type <br />tandard (66301) <br />ngle (BB304) <br />Standard (BB301) ngle (86304) <br />Post Settings t %:O.C. <br />5" 5-1/2" <br />76-1/2" 7' <br />4-1/2" 5" <br />Gate posts shall be set in accordance with the spacing shown in the submitted fencing design plans. Six <br />(6) inch or four (4) inch chrome wheels shall be bolted to the gate (between the wheel plates welded near <br />the ends of the gate bottom rail). The gate shall be set upright with the V-grooved wheels positioned over <br />the pre- installed steel V-track inset and flushed to a concrete base that traverses the gate opening. Roller <br />guides shall be affixed to the gate posts at a height even with the gate top rail to hold the gate in a vertical <br />position. Gate stops shall be welded to the end of the gate or track so gate cannot pass rollers in either <br />direction. <br />Upon request, a fabricated manual lock shall be installed on the face of the gate. The fabricated lock's <br />placement should not interfere with the closing of the gate. A WWI capable entry keypad and buried loop <br />detectors to be provided for gate entry upon request. A Knox Box or approved equal fire access box shall <br />be installed alongside the keypad entry. <br />VINYL -COATED CHAIN -LINK FENCING INSTALLATION STANDARDS: <br />Vinyl -coated chain -link fencing and gate materials shall be furnished and installed by Contractor at <br />locations as specified by the City on an as -needed basis. <br />The following installation standards shall be followed: <br />1. Manufacturers installation and warranty requirements <br />2. Applicable OSHA and Cal OSHA regulations <br />3. Applicable building and fire code requirements <br />4. City Codes <br />Refer variances between above documents and Contract Documents to Owner's Representative. Install <br />fencing and gates according to Manufacturer's installation and warranty requirements. Contractor shall <br />contact dig alert before installation. <br />Install vinyl -coated chain -link fencing and gate materials to tolerances recommended by Manufacturer <br />and per submitted and approved chain -link fencing design. Unless otherwise shown, install fencing true, <br />plumb, and level using precision gauges and levels. Footings shall be specked by the Contractor in vinyl - <br />coated chain -link fencing design submittal and approved by the City prior to installation. <br />Clean surfaces of metalwork to contact concrete, removing all rust, dirt, grease and other foreign <br />substances before concrete is placed. Secure all embedded metalwork accurately in position when <br />concrete is placed to prevent displacement or <br />ON -CALL INSTALLATION, MAINTENANCE AND REPAIR FOR FENCING AND GATES 26 <br />