Laserfiche WebLink
Water Tow <br />Tours <br />• Public Works must complete <br />an engineering analysis to <br />determine whether the � <br />structure is safe for visitors <br />• Initial Feasibility & Seismic <br />Study may be $150K, not yet <br />Imo""-` �'� <br />o _ • = � -. <br />r . <br />� <br />uded in draft budget <br />I <br />AN <br />9 <br />City of Santa Ana <br />4 <br />