• Developed preliminary and final design for 6,000 gpm 1X system for PFAS treatment at the N-Wells and 1,200 <br />gpm IX system for Perchlorate Treatment at the Q2 Well. <br />• Provided engineering services during construction for IX equipment pre -purchase and for site construction. <br />KJ I Elsinore Valley Municipal Water District I Canyon Lake WTP Phase 1 <br />Improvements I Ongoing <br />Team: David Ferguson, Steve Diamond, Kajori Purkayastha Project Contact: <br />This project consists of designing improvements to an existing surface water treatment Parag Kalaria, PE <br />plant, Canyon Lake Water Treatment Plant (CLWTP), described as the Phase I Water Resources Manager <br />improvements in alignment with the CLWTP Facilities Master Plan (2017). PFOA and (951) 674-3146 <br />PFOS levels in Canyon Lake exceeded the California Notification Levels and PFOA <br />levels exceeded the state Response Level. KJ was retained to perform a feasibility study to <br />evaluate planning level alternatives for the proposed Facilities Master Plan improvements <br />to the treatment plant. The design effort includes new PFAS treatment as recommended in <br />the CLWTP Site Feasibility Study (2020). The project also includes pilot testing for PFAS, <br />bench testing for cyanotoxins, Preliminary Design, Final Design environmental services <br />(CEQA support), public outreach, and bid phase services. <br />The 9-month pilot study looked at GAC, IX, and the dual barrier combination of GAC <br />followed by IX. The dual barrier PFAS treatment system with GAC followed by IX is now <br />proceeding from 60% to 90% design. <br />EEC I City of Anaheim I On -call Engineering Services 12007 - Ongoing <br />Team: Will Shaffer, Jim Kolk, John Shaffer, Brandon Willnecker Project Contact: <br />EEC provides as -needed environmental engineering services across multiple scopes of Keith Linker, PE <br />work. EEC's staff have provided design and consulting services in the following areas: Principal Civil Engineer <br />• Sewer capacity analysis and sewer design manual development (714) 765-4141 <br />• Lenain pump station retrofit — Civil Engineering, grading, NPDES compliance <br />• Alley sewer upsizing combined with water quality improvements <br />• City trash amendment compliance — BioChar treatment and catch basin screening <br />• Modjeska Park regional stormwater capture — Post construction grant compliance, digital monitoring program, <br />O&M optimization <br />• Citywide stormwater fee generation planning <br />• Regional Stormwater Capture project feasibility planning <br />• Richfield and La Palma stormwater capture and infiltration flood relief project <br />• State College storm drain project— repurpose abandoned sewer line for groundwater recharge and reduce inflow to <br />county drainage facilities <br />• District 27 drainage analysis <br />• Prop 1 and Metropolitan Water District grant funding application support <br />• Comprehensive citywide stormwater pump station evaluation <br />FReferences <br />References have been provided for each relevant project in Section E Relevant Experience above. EEC is happy to provide <br />additional references upon request. <br />EEC Environmental 13 November 17, 2022 <br />