My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Calculations <br />• Design codes and reference standards <br />• Project schedule, including design and construction milestones <br />• Assumptions and potential risks <br />• Preliminary list of needed specifications and standard/typical details <br />• Preliminary bid packaging and construction sequencing strategies <br />• 10 Percent Design Drawings (see anticipated drawing list below). <br />Deliverables <br />1. Draft PDR with 10% Design Drawings (Electronic, pdf format). <br />2. Tabulated comment responses for Draft PDR review form (Electronic, pdf format). <br />Task 3 - 30% Design <br />Based on the design concepts and criteria established in the Draft PDR, the EEC Team will prepare a Final PDR to serve as <br />the 30% design submittal package. Drawings will be prepared using AutoCAD format. Drawings will be set up with 22" x <br />34" format for submittal and can be reduced to half scale 11" x 17" size for bidding purposes. The 30% design is anticipated <br />to contain the following information: <br />• General and civil site layouts <br />o Land acquisitions, if applicable <br />o Preliminary horizontal and vertical alignment <br />o Pipeline Design Criteria <br />• Size, wall thickness, lining, coating, and cover requirements <br />• Preliminary pipe pressure, thickness, joint and fitting design <br />• Preliminary trench cross sections <br />o Well 26 Sand Separator Criteria <br />o In -line Booster Pump Station Criteria <br />o HAS IX Treatment Design Criteria <br />• Cartridge pre -filters <br />• Number of trains and vessels <br />• fX wash water supply (WWS) and wash water waste (WWW) <br />• System appurtenances <br />• Mechanical piping and equipment layouts <br />• Structural <br />• Electrical site layout, single -line diagram with power source <br />• Process & Instrumentation Diagrams (P&IDs) <br />• Identification of any fatal flaws <br />• Finalized design criteria <br />• Estimated project schedule <br />• 30 Percent Design Drawings (see anticipated drawing list below) <br />Deliverables <br />1. Final PDR with 30% Design Drawings (Electronic, pdf format). <br />2. 30% Design List of Specifications (Electronic, pdf format). <br />3. 30% Cost Estimate (Electronic, pdf format). <br />EEC Environmental 16 November 17, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.