Laserfiche WebLink
II. Architectural System, if Applicable <br />• Complete set of architectural <br />drawings <br />• All appropriate schedules <br />Ill. Structural System <br />• Complete set of structural drawings <br />• Final structural details and <br />calculations <br />IV. Civil Site Plan System <br />• Complete set of civil plans including <br />quantities, utility connections, and site drainage <br />• Landscaping and irrigation system plans, if applicable <br />• Traffic control plans and SWPPP will be defined as the Contractor's responsibility <br />V. Mechanical System <br />• Complete set of process mechanical and building mechanical plans <br />• Final control diagrams, control point list, and sequence of operations <br />• Final building components U-value calculations and final energy code calculations <br />VI. Electrical System <br />• Final electrical details including lighting, receptacles, and equipment circuited <br />• Final balanced load panel schedules and fixture schedules <br />• Complete one -line diagrams directly linked to the panel schedule <br />• Final electrical load calculations and final arc flash analysis <br />VII. Instrumentation and Control System <br />• Final control, security, and alarm plans <br />• Final P&IDs and associated Inputs/Outputs <br />• AC/DC power distribution wiring diagrams <br />Deliverables <br />1. Bid Set Design Drawings (Electronic, pdf format). <br />2. Bid Set Design Specifications (Electronic, pdf format). <br />Task 7 - Bid Phase and Construction Support <br />Detailed scopes of work for bid phase and construction phase support services will be proposed during the design phase of <br />the project. Scopes of work will generally conform to the corresponding scopes of work identified in the RFP. <br />EEC Environmental 18 November 17, 2022 <br />