Laserfiche WebLink
As -Needed Engineering I City of Anaheim Public Works Department I Anaheim, CA <br />• Providing as -needed engineering support for multiple Public Works programs and projects. <br />• Services include drainage design review, NPDES and WDR permit compliance, sewer master planning review, FOG program <br />development, and drainage design review. <br />Two Harbors Wastewater Treatment Plant Assessment ( Santa Catalina Island Company ( Catalina Island, CA <br />• Assessed the condition and operations of the existing W WTP serving the Two Harbors community. <br />• Developed an action plan to address a variety of technical and operational deficiencies identified as contributors to on -going <br />compliance issues. Corrective measures were identified and implemented covering mechanical repairs, equipment <br />rehabilitation, SOPS and operations personnel training. <br />Wastewater Pretreatment Design -Build ( Aerospace Company ( Long Beach, CA <br />• Managed a 7,000-gallon batch treatment design -build project to upgrade the wastewater pretreatment system for an <br />industrial facility. <br />• Treatment processes include waste stream segregation, influent equalization, chromium reduction and chemical <br />precipitation, sludge dewatering, pH adjustment, and effluent equalization and clarification. <br />• Scope of work included secondary containment upgrades and CUPA tank inspections. <br />• Completed design and permittingfor all system components including site development, utilities, piping, pumping, controls, <br />electrical, and structural. <br />• Managed construction of new system including tank/equipment procurement, demolition, and equipment installation. <br />• Performed and refined system operations for 18+months. <br />Water, Wastewater, Recycled Water, and Stormwater Master Planning for a 400+Acre Property Owner I Southern CA <br />• Delivering master planning and conservation support for water, wastewater, recycled water, and stormwater systems. <br />• Developed a comprehensive wastewater treatment alternatives analysis for a 400+ acre property owner generating 150k+ <br />gpd of wastewater and utilizing Title 22 treated effluent for recycled water irrigation. <br />• Included planning -level cost estimates over a 20-year project lifespan for wastewater alternatives comparison and selection. <br />• Provided consulting services for negotiations with multiple local agencies. <br />• Projected future wastewater demands based on planned developments and ongoing projects. <br />Owner's Representative, 62,000 ftz Laundry Development I UniFirst Corporation ( Hammond, IN <br />• Peer review of civil construction documents for accuracy and constructability. <br />• Construction administration including: contractor RFI response, traffic control design, utility conflict resolution, <br />environmental planning and non -hazardous waste disposal, expedited permitting services for permit revisions, value <br />engineering for stormwater detention system. <br />• Wastewater pretreatment system engineering and Industrial Waste Discharge (IWD) permitting. <br />Design -Build UST Removal and AST Install (tube & Waste Oil) Systems ( City of Torrance I Torrance, CA <br />• Managed design -build contract for the City of Torrance Fleet and Transit Facilities while maintaining site operations. <br />• Removal of 16 USTs (550 gal — 20,000 gal) with site closure. <br />• Installation of 13 ASTs (250 gal —3,000 gal), delivery systems, leak detection, and hose reels (50+). <br />Methane Mitigation System Inspection and Commissioning ( LAUSD ( Los Angeles, CA <br />• Performing methane deputy inspection services for a multi -phased Comprehensive Modernization project at the Roosevelt <br />High School. <br />• Serving as the Gas Mitigation Commissioning Project Manager and overseeing the Methane Inspector and Engineer. <br />• Authoring required plans including CQA, T&I, Baseline Testing and Startup, and O&M plan for DTSC approval. <br />PRESENTATIONS <br />TRSA — PFAS: The Impact on the Industry, July 2022. <br />