My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avenue 64 Roadway Project* I City of Pasadena (2021) 1 Pasadena, CA <br />• Managed the stormwater and water quality design for a round about intersection improvement project in the City of <br />Pasadena. <br />• Conceptualization of a round -a -bout at the intersection of three roadways within a residential area of the City. <br />• There was no existing storm drain infrastructure at the intersection and the proposed design required capturing and treating <br />runoff prior to surface flowing across the proposed round -a -bout and creating hazardous roadway conditions. <br />• Proposed solution required designing catch basins to accept multiple upstream watersheds along steeply slopes streets and <br />conveying underground and down -road to gutter based bubblers. <br />UCI Medical Center Imaging Building (2019-2021) 1 UCI Medical Center I Orange, CA <br />• Served as Project Manager for a campus redevelopment project that included the demolition of existing structures, utilities <br />parking lots, and irrigation systems, and replaced them with new structures, surface features, and wet/dry utilities. <br />• Task included working the preparation of detailed precise grading plans and coordinating with multiple disciplines and <br />adjacent projects during plan production and construction management. <br />Doheny Desalination Plant (2020-2021) 1 South Coast Water District I Dana Point, CA <br />• Managed the development of the Preliminary Grading Plan and Water Quality Management Design for design development <br />permitting approval for a design build project. <br />• Led the preparation of a watershed level hydraulic study to incorporate future sea level rise, off site run on drainage, and on <br />site drainage; ensuring that the future desalination plant will remain above anticipated future water surface elevations. <br />Lower Peters Canyon Regional Park (2020-2021) 1 Orange County Parks I North Tustin Area, CA <br />• Project Manager for an improvement project within a Regional Park for the installation of a 6-stall restroom facility, updated <br />trailhead, sewer lift station, and utility installations under an existing OC Flood Control District improved Spillway. <br />• Project required coordination with the Division of Dams, Irvine Ranch Water District, Southern California Edison, and OC Parks <br />and Flood. The project is highlighted by the utilization of horizontal directional drilling methods to install a private sewer <br />force main, domestic water service, and electrical ductwork, under an existing improved flood control spillway. <br />Lost Canyons Country Club Redevelopment (2017-2019) 1 Newport Pacific Land I Simi Valley, CA <br />• Project Manager for the Redevelopment of two 18-hole golf courses into a single 18-hole golf course, and 300+single family <br />residential community. <br />• Executing the stormwater strategy so that the developed project met the local jurisdictional requirements for NPDES <br />compliance, as well as mitigated impacts in flow, volume, and TMDL's for Tapo Canyon Creek. <br />• Water quality objectives were achieved through the implementation of multiple interconnected above ground water quality <br />basins, combined with proprietary treatment devices, to reduce flow rates, promote infiltration for volume controls, and <br />active treatment for removal of TIVI <br />• The project required roadway widening, incorporation of bus stops, and bike lanes to integrate into existing improvements <br />and be adaptable to future widening projects. <br />Industrial General Permit Stormwater Services I Waste Management I Simi Valley, Santa Ana, Moreno Valley, CA <br />• Reviewed and prepared updates and modifications to IGP SWPPP's for four facilities in Southern California. <br />• At the Simi Valley Landfill engineered a revised access road and weigh station and incorporated updated storm drain design <br />for an outlet to a large scale settling basin to capture sediment and maintain baseline status forthe landfill facility. <br />• At the Moreno Valley Transfer station, updated the IGP SWPPP to redefine the sampling locations and designed a treatment <br />train system to remove TSS form runoff to bring the site back into baseline status. <br />• At the El Cajon Facility in San Diego, conceptualized a design to incorporate a Jellyfish Membrane Filter at the site outfall into <br />Bradley Creek to pilot bacteria removal for pending dry weather TMDL regulations. <br />• Design two at grade treatment systems to mitigate T55 in overland flows that discharged off site. Involved the design of an <br />infiltration gallery at one discharge point and an elevated at grade proprietary filter at the other outfall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.