My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GB COOKE, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
GB COOKE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 3:30:22 PM
Creation date
5/8/2023 12:57:27 PM
Metadata
Fields
Template:
Contracts
Company Name
GB COOKE, INC.
Contract #
P 21-2744
Agency
Public Works
Council Approval Date
10/4/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 21-2744 Goat Encounter Change Order Number 1 <br />To G.B. Cooke, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specircations on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKs.AGENCY <br />EXTRA WORK AT AGREED PRICE <br />8. Additional %" HDPE treads were installed on the raised trail in order to prevent goat, waste <br />buildup on the trail, making it easier for staff to maintain. (PCO #9R1) <br />TOTAL AGREED PRICE = $8,288.00 <br />9. Due to field conditions, additional irrigation was installed for the new tree location, an <br />existing mainline was moved, existing shade sail post was relocated, and trenching was <br />performed for an electrical outlet. (PCO #10) <br />TOTAL AGREED PRICE = $4,043.00 <br />10. The concrete slab under the tractor was thickened to allow for drainage of the area and also <br />meet elevation of raised trail. (PCO #11) <br />TOTAL AGREED PRICE = $487.00 <br />11. Due to field conditions and per Staff request, planter areas were reconfigured to avoid utility <br />lines and to allow tree relocation. Additional fencing material was used to accommodate <br />the new layout. (PCO #12) <br />TOTAL AGREED PRICE = $2,967.00 <br />12. Staff requested to refurbish the existing Goat Building by applying paint and a decorative <br />decal. (PCO #13) <br />TOTAL AGREED PRICE = $23,431.00 <br />13. Additional fence posts and bracing need to be installed in order to support a leaning fence. <br />(PCO #14) <br />TOTAL AGREED PRICE = $1,200.00 <br />TOTAL CHANGE ORDER AMOUNT <br />$79,976.00 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.