Laserfiche WebLink
�. aOntario • San Diego • Irvine • Pasadena • Fresno <br />/ 111��� Sacramento • Pleasanton <br />(S_ Fre safe y system Integmton Telephone: (877) 331-2084 • Fax: (909) 628-7774 <br />Following each inspection noted above will be a detailed report. Any deficiencies noted will be quoted on a <br />separate proposal. <br />YEAR 1: <br />• Semi -Annual Fire Alarm Testing/inspection <br />• Semi -Annual Hood Inspection <br />semi-annual inspection is included with one of the fire alarm inspections) <br />• Annual Fire Sprinkler Inspection <br />• Annual Fire Hydrant Testing <br />• Annual Fire Pump Inspection <br />• TOTAL ANNUAL INVESTMENT is "Not to Exceed" <br />YEAR 2: <br />• Semi -Annual Fire Alarm Testing/Inspection <br />• Semi -Annual Hood Inspection <br />semi-annual inspection is included with one of the fire alarm inspections) <br />• Annual Fire Sprinkler Inspection <br />• Annual Fire Hydrant Testing <br />• Annual Fire Pump Inspection <br />• TOTAL ANNUAL INVESTMENT is "Not to Exceed" <br />$ 6,267.50finsp. ($12,535.00/year) <br />$1,125.00 for one inspection (other <br />$ 4,320.00 <br />$ 540.00 <br />$1,080.00 <br />$19,600.00 <br />$ 6,500.00finsp. ($13,000.00/year) <br />$1,150.00 for one inspection (other <br />$ 4,500.00 <br />$ 575.00 <br />$1,150.00 <br />$ 20,400.00 <br />• Semi -Annual Fire Alarm Testing/Inspection $ 6,695.00 ($13,390.00/year) <br />• Semi -Annual Hood Inspection $1,175.00 for one inspecfion (other <br />semi-annual inspection is included with one of the fire alarm inspections) <br />• Annual Fire Sprinkler Inspection $ 4,635.00 <br />• Annual Fire Hydrant Testing $ 595.00 <br />• Annual Fire Pump Inspection $1,185.00 <br />• TOTAL ANNUAL INVESTMENT is "Not to Exceed" $ 20,980.00 <br />Special Instructions and Exclusions <br />• Testing to be performed during regular HCI business hours. <br />• Engineering to assist with auxiliary function testing and resetting of equipment (elevators, HVAC/mechanical <br />equipment, etc.). <br />• Notifying inhabitants of the subject building(s) about the time and duration of testing is excluded and is the <br />responsibility of others. <br />• Control of Electric power in the subject building during the testing is excluded and is the responsibility of <br />others. <br />• Access to all areas are to be provided by the facilities engineering staff. <br />• Billing will take place upon completion of the testlinspection. <br />• Inspection reports will be provided following each inspection. Quote to repair any deficiencies noted will be <br />made in a separate proposal and submitted for approval. <br />V 082622.1, Quoted 9116/22 Page 2 of 6 <br />