Laserfiche WebLink
DUDEK <br />On -Call Environmental Services <br />Client and Contact: North County Transit District (NCTD), Bruce Smith (formerly with NCTD and <br />now with SANDAG as Principal Engineer); bruce.smith@sandag.org; 619.699.1907 <br />Completion Date: March 2016 <br />Location: North San Diego County, California <br />Description: <br />Dudek provides on -call CEQA/NEPA services and full range of associated technical support services <br />to NCTD. Services covered under this on -call can include preparation of environmental documents <br />pursuant to CEQA and/or NEPA, undertaking surveys and technical reports either independently or in <br />support of environmental documents, and providing compliance services to NCTD for ongoing <br />construction and operations. Under the on -call contract Dudek has performed raptor nesting surveys <br />and secured highest ratinas on NCTD's evaluation forms for our services. <br />Client and Contact: Orange County Public Works; James Volz, Project Manager; <br />James.Volz@ocpw.ocgov.com; 714.834.4000 <br />Completion Date: June 2018 <br />Location: Santa Ana, California <br />Description: <br />Under its existing on -call contract with Orange County Public Works, Dudek has provided effective <br />mitigation planning and biological monitoring services for the Los Alamitos Pump Station, Talbert <br />Nature Preserve South, Laguna Canyon, and Haster Basin Mitigation Projects. As the biological <br />monitoring team during mitigation monitoring periods for these projects, Dudek was asked to <br />evaluate ongoing problematic site conditions and provide effective adaptive management <br />recommendations that would bring the mitigation into compliance with mitigation performance <br />standards. Dudek has performed monitoring at Talbert Nature Preserve South, including <br />comprehensive site investigations, soil sample collection, testing and analysis, surface hydrology <br />evaluation, polyphagous shot hole borer infestation evaluation, and botanical monitoring. Dudek <br />provided recommendations to the maintenance contractor through quarterly monitoring reports. <br />Dudek identified significant site constraints that prevent target riparian habitat development and <br />formed the basis for creative recommendations to achieve permit requirements, including a pilot <br />project to test a new riparian mitigation approach in response to hyper soil salinity. Dudek is <br />preparing annual reports and an annual assessment of progress toward mitigation goals. Dudek also <br />designed and prepared a habitat management and monitoring plan and construction documents for <br />the Edinger Bridge Replacement Project, which detailed implementation, monitoring, and <br />maintenance for establishment of approximately 1.25 acres of native salt marsh at the Talbert Nature <br />Preserve South. <br />On -Call Environmental Services RFP# 21-105 17 <br />