My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECORP CONSULTING, INC. (2)
Clerk
>
Contracts / Agreements
>
E
>
ECORP CONSULTING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:49:30 AM
Creation date
5/15/2023 4:36:53 PM
Metadata
Fields
Template:
Contracts
Company Name
ECORP CONSULTING, INC.
Contract #
A-2023-033-03
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/20/2026
Insurance Exp Date
10/1/2023
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to the City of Santa Ana for On -Call Environmental Services <br />removal on the Lower Peters Canyon Retarding Basin Project. ECORP submitted a <br />compliance memorandum to the County. <br />♦ Santa Ana River Cleanout Surveys and Monitoring. ECORP conducted <br />nesting/breeding bird and grunion surveys prior to sediment removal operations at the <br />Santa Ana River Outlet. ECORP biologists identified nests in the project area and <br />demarcated grunion run areas for avoidance during operations in accordance with <br />regulatory permits. Also, provided full-time biological construction monitors to protect <br />nests, grunion run areas, snowy plovers, and least terns during operations. <br />♦ C05 Maintenance Road Improvement Project. ECORP conducted a biological <br />reconnaissance survey and field meeting at a proposed staging area for the placement of <br />the disintegrate granite for the Project. A follow-up memo was prepared with <br />recommendations, addressing California Coastal Commission concerns. <br />♦ Lower Peters Canyon Basin HMMP. Prepared a Habitat Mitigation and Monitoring Plan <br />(HMMP) for planned maintenance activities within a retarding/ retention basin. Project <br />duties included performing an assessment of the site for mitigation potential, developing <br />a conceptual site restoration plan, incorporating into the HMMP avoidance measures for <br />federally protected coastal California gnatcatcher and least Bell's vireo, and submitting <br />for resource agency review and approval. <br />♦ Santa Ana River Bridges CEQA Addendum. ECORP prepared an Addendum to a <br />Program EIR addressing engineering improvements to enhance safety and security at 8 <br />bridges along the Santa Ana River from Yorba Linda to Huntington Beach. <br />♦ Trabuco Creek Road Dust Control and Soil Stabilization. ECORP provided <br />preconstruction nesting bird survey services in addition to work environmental awareness <br />training in addition to pamphlet handouts for construction workers. Biological construction <br />compliance monitoring was also provided during dust control and soil stabilization <br />measures being applied to Trabuco Creek Road from Trabuco Canyon Road to the first <br />creek crossing. <br />♦ Hospital Road and Justice Way CEQA Documentation. ECORP prepared a <br />Categorical Exemption with technical studies for roadway improvements near the Orange <br />County Juvenile Justice Center in Orange, California. Technical studies included air <br />quality/GHG and noise, and cultural/historic resources. <br />OC Loop Bikeway Segment D Project. ECORP prepared Cultural Resources, <br />Biological Resources, and Location Hydraulic studies for the OC Loop Segment D Class I <br />Bikeway project, located from Imperial Highway south to Bastanchury Road along the <br />Carbon Canyon Flood Channel. ECORP prepared an Area of Potential Effects (APE) <br />Map, an Archaeological Survey Report (ASR), and a Historic Property Survey Report <br />(HPSR). ECORP's archaeologist obtained Sacred Lands search file and a list of Native <br />American contacts for the project area from the California Native American Heritage <br />Commission (NAHC) in compliance to the Caltrans Section 106 guidelines. ECORP also <br />prepared a Natural Environment Study/Minimal Impact (NESMI) for the project that <br />described the existing biological environment at the project site, based on the results of <br />our survey work and research conducted. ECORP submitted cultural and biological <br />ECORP Consulting, Inc. <br />EVCIRON VF\lAI. CONS ULTAYTS <br />October2l, 2021 ■ 15 <br />P21-590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.