Laserfiche WebLink
COST PROPOSAL Page 2 of 3 <br />SPECIFIC RATE OF COMPENSATION (USE FOR ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant Ninyo & Moore ❑ Prune Consultant ® Subconsolent <br />Project No. Contract <br />1/31/2023 <br />SCHEDULE OF OTHER <br />DIRECT COST ITEMS <br />(Add additional n es as necessary) <br />Description ofltem <br />Quantity <br />Unit <br />Unit Cost <br />Total <br />Ialemator,Testing Services in Accordance with the <br />Attached Schedule of Pees for Laboratory Testing <br />Subeh suhumt l: <br />$ <br />Sub,hmhmtanl2: <br />$ <br />Subcwuulthet1 <br />$ <br />Subcoreultant4, <br />$ <br />Note: Add additimul page, ifuxessary. <br />MOTHS: <br />1. List other direct cost items with estimated mau.These is should be competitive in their respective industries andsuppmnd withn mpriate doenwertatwn, <br />2. Proposed ODC items should be consistently billed regardless ofelieat and connect type. <br />3. Items when incurred ter the same purpose, in like chcrosatance, should not be included in arty indirect cast pool he N the overhead rate. <br />4. Items such as special tooling will be teimbu.d st actual cost with sopporth, dommentation (invoice). <br />5. Items listed above that would be considered "tools fthe trade" me run reimbursable as othe, direct mat. <br />6. Travel related costs slmuld be pre.appmvsd by the ccutradmi, agency aed shall not aimed current StateDepartment ofPemmerel AdmWsumbn miss. <br />Page 3 of3 <br />June 2021 <br />