My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUDEK (4)
Clerk
>
Contracts / Agreements
>
D
>
DUDEK (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:49:00 AM
Creation date
5/15/2023 4:39:22 PM
Metadata
Fields
Template:
Contracts
Company Name
https://ecms.santa-ana.org/Forms/LOA
Contract #
A-2023-033-02
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/20/2026
Insurance Exp Date
8/28/2023
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FC7E9346-8A22-4923-BD05-AA3CA0439641 <br />DUDEK <br />Client and Contact: City of Santa Ana, Suzi Furjanic, Associate Park Planner; sfurjanic@santa- <br />ana.org; 714.667.2207 <br />Completion Date: March 2020 <br />Location: Santa Ana, California <br />Description: <br />Dudek was hired by the City of Santa Ana to develop a comprehensive rehabilitation plan for <br />Centennial Park Lake and the area surrounding the lake. The goal of the rehabilitation project was to <br />identify problems, and needs with the lake, lake equipment, the lake park area, park visitors, and lake <br />maintenance. Dudek staff performed a comprehensive site analysis through a review of the lake as - <br />built plans, right-of-way documents, existing utilities plans, soils and geologic information, and <br />Irrigation plans. In addition, Dudek staff visited the park to take a detailed survey and inventory of the <br />equipment on -site and the operational status of each piece of equipment. Additionally, lake water and <br />soil samples were taken and analyzed to assess the water quality and type of the subsurface lake <br />liner. <br />Client and Contact: Orange County Public Works; James Volz, Project Manager; <br />James.Volz@ocpw.ocgov.com; 714.834.4000 <br />Completion Date: August 2021 <br />Location: Orange, California <br />Description: <br />Dudek supported the County through the CEQA and Caltrans National Environmental Policy Act <br />(NEPA) compliance process for this project. Dudek prepared a Mitigated Negative Declaration <br />(MND), Preliminary Environmental Study checklist, and various technical studies to satisfy the <br />Caltrans NEPA compliance process. The project involves the replacement of an existing bridge with a <br />Client and Contact: City of Anaheim Public Utilities Department; Jonathan Sanks, Environmental <br />Services and Safety Manager, jsanks@anaheim.net; 714.765.4117 <br />Completion Date: March 2021 <br />Location: Anaheim, California <br />Description: <br />Dudek assisted the City of Anaheim Public Utilities Department with technical studies in support of <br />CEQA for additional water treatment, production and distribution facilities at four sites in the City of <br />Anaheim. The additional water treatment facilities included ion exchange treatment to remove PFAS <br />from groundwater. The project included installation of water treatment facilities at the La Palma, Linda <br />Vista, Boysen Park and Energy Field sites in the city. Dudek prepared an Air Quality and Greenhouse <br />Gas Emissions Technical Memorandum, a Biological Resources Technical Memorandum, a <br />Jurisdictional Delineation, an Archaeological Investigation Report, and a Noise Technical Report used <br />in the City- prepared MND which was adopted in April 2021. <br />On -Call Environmental Services RFP# 21-105 1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.