Laserfiche WebLink
PROPOSAL FOR <br />On -Call Environmental Services <br />RFP NO.: 21-105 <br />tracked timelines. She has prepared and managed CEQA/NEPA documents including Initial Studies (ISs), <br />Mitigated Negative Declarations (MNDs), Environmental Impact Reports (EIRs), Environmental Assessments <br />(EAs), and Environmental Impact Statements (EISs), for projects throughout California on behalf of federal, <br />state, regional, and local agencies and private clients. Her expertise also includes data collection and analysis <br />on environmental issues such as visual resources, land use, public services, biological resources, <br />socioeconomics, recreation, and utilities. <br />REPRESENTATIVE PROJECT EXPERIENCE: <br />• Well 32 IS/MND Rehabilitation and Pipeline Project, Santa Ana, CA <br />• Well 12, Well 14, and Pipeline Project IS/MND, Santa Ana, CA <br />• Washington Avenue Well Project IS/MND, Santa Ana, CA <br />• First Street Stabilization Project Categorical Exemption (CATER), Santa Ana, CA <br />• Water Well No. 39 Hydro -generator Unit Replacement Project CATEX, Santa Ana, CA <br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA <br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA <br />• Central Park Program EIR, Rancho Cucamonga, CA <br />• Adventure Park Multi -Benefit Stormwater Capture Project Addendum to PEIR, Whittier, CA <br />• Santa Ana River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA <br />• Cit of Huntin ton Beach, Water Well Project IS, Westminster, CA <br />LICENSES, REGISTRATIONS, & <br />CERTIFICATES: <br />EDUCATIONAL BACKGROUND: <br />PhD Geomorphology, Johns <br />POSITION WITH TETRA TECH: <br />Senior Project Manager <br />MSHA 24-Hour trained, 2017 <br />MSHA 8-Hour Refresher, 2018 <br />Hopkins University <br />BA Physical Geography, <br />PROJECT ROLE: <br />Environmental Services, <br />University of California, <br />Geological/Soil Study, <br />Berkeley <br />Mineral Resource Study, <br />Hydrology/Water Quality Study <br />EXPERIENCE: <br />Dr. Coleman is a Senior Project Manager who has over 30 years of experience in environmental consulting, <br />primarily focused on water resource evaluations and NEPA/CEQA assessments. He has managed <br />preparation of numerous environmental document projects for commercial -scale alternative energy projects, <br />as well as contributed to assessment documents as a technical lead for geology and soils, and/or water <br />resources. Dr. Coleman's technical specialization is in geomorphology and hydrology. He has applied his <br />expertise in fluvial geomorphology to erosion and sedimentation analyses, flood plain delineation and <br />evaluation, wetlands delineation (the surface water -groundwater interface), and archaeological <br />geomorphology. His hydrology experience includes engineering design of surface drainage systems, <br />environmental contaminant evaluation (primarily soils and groundwater), environmental impact assessments, <br />and underground storage tank investigations. <br />REPRESENTATIVE PROJECT EXPERIENCE: <br />• Well 32 IS/MND Rehabilitation and Pipeline Project, Santa Ana, CA <br />• Well 12, Well 14, and Pipeline Project IS/MND, Santa Ana, CA <br />• Washington Avenue Well Project IS/MND, Santa Ana, CA <br />• First Street Stabilization Project CATEX, Santa Ana, CA <br />• Water Well No. 39 Hydro -generator Unit Replacement Project CATEX, Santa Ana, CA <br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA <br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA <br />• Central Park Program EIR, Rancho Cucamonga, CA <br />• Santa Ana River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA <br />• City of Huntington Beach, Water Well Project IS, Westminster, CA <br />City of Santa Ana 4 TETRA TECH <br />