My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (9)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:48:31 AM
Creation date
5/15/2023 4:50:22 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-033-01
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/20/2026
Insurance Exp Date
10/1/2023
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR <br />On -Call Environmental services <br />RFP NO.. 21-105 <br />Tetra Tech has considerable experience preparing environmental documents for projects under CEQA (as <br />well as NEPA). Table 3 lists specific projects as examples of our recent and completed relevant project <br />experience. Current, on -going relevant projects are presented in Table 4. Project experience for our <br />subconsultant, UltraSystems is shown in Table 5. <br />3. TETRA TECH RECENT <br />PROJECTTABLE <br />RELEVANT <br />Project, Location, <br />Completion Date <br />Project D- <br />Well 32 <br />Provided engineering <br />City of Santa Ana, <br />Paula Fell — CEQA Project <br />Rehabilitation and <br />design services and <br />Public Works Agency <br />Manager <br />Pipeline Project <br />prepared IS/MND and <br />Contact: Armando <br />Derrick Coleman — CEQA <br />IS/MND and NEPA <br />NEPA documentation <br />Fernandez, PE, Senior <br />Support, Quality Assurance/ <br />documentation. <br />for the rehabilitation of <br />Civil Engineer <br />Quality Control <br />2801 North <br />existing Well No. 32 and <br />construction of a new <br />Phone: 714.647.5629 <br />Amanda Beck —Biological <br />Westwood Avenue, <br />Santa Ana, CA <br />above ground well <br />Email: <br />Resources <br />building and <br />Afernandez@santa- <br />Jenna Farrell — Cultural <br />2020 <br />approximately 3,250 <br />ana.org <br />Resources <br />linear feet of new <br />Erin King — Cultural Resources <br />pipeline. <br />Kevin Fowler —Noise <br />Chris Hulik— Noise <br />Jeff Harrington — Air <br />Quality/GHG <br />Tiffanie Ramos —Air Quality/ <br />GHG <br />Well 12, Well 14, <br />Provided engineering <br />Mesa Water District <br />Paula Fell — CEQA Project <br />and Pipeline Project <br />design services and <br />Contact: Phil Lauri, PE <br />Manager <br />IS/MND <br />prepared an IS/MND for <br />Assistant General <br />Derrick Coleman — CEQA <br />4011 W. Chandler <br />two new water supply <br />Manager <br />Support, Quality Assurance/ <br />Avenue and <br />wells and pipelines. <br />Phone: 949.631.1291 <br />Quality Control <br />3120 S. Croddy <br />Email: <br />Jenna Farrell —Cultural <br />Way, Santa Ana, CA <br />phil@mesawater.org <br />Resources <br />2019 <br />Kevin Fowler— Noise <br />Amy Noddings — Biological <br />Resources <br />Well No. 39 Hydro- <br />Prepared a CATEX for <br />City of Santa Ana, <br />Paula Fell — CEQA Project <br />generator Unit <br />the replacement of a <br />Public Works Agency <br />Manager <br />Replacement Project <br />hydro -generator unit for <br />Contact: Armando <br />Derrick Coleman — CEQA <br />CATEX <br />the Well 39 building at <br />Fernandez, PE, Senior <br />Support, Quality Assurance/ <br />2401 N. Bristol <br />the John Garthe <br />Civil Engineer <br />Quality Control <br />Street, Santa Ana, <br />Reservoir and Pump <br />Phone: 714.647.5629 <br />CA <br />Station facility. <br />Email: <br />2020 <br />Afemandez@santa- <br />ana.org <br />City of Santa Ana 1111 TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.