My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (9)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:48:31 AM
Creation date
5/15/2023 4:50:22 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2023-033-01
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/20/2026
Insurance Exp Date
10/1/2023
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR <br />On -Call Environmental Services <br />RFP NO.: 21-105 <br />TABLE <br />3. TETRA TECH RECENT <br />RELEVANT PROJECT <br />EXPERIENCE <br />Project, Location, <br />Completion . <br />Project Description <br />Reference <br />Key Project Personnel <br />2017 <br />pipeline between Prado <br />Phone: 714.647.3962 <br />Jenna Farrell — Cultural <br />Dam and Weir Canyon <br />Email: <br />Resources <br />Road to allow operation <br />Greg.Yi@ocpw.ocgov.or <br />Kevin Fowler — Noise <br />of the Santa Ana River <br />9 <br />Mainstem Project. <br />City of Huntington <br />Prepared an Initial <br />City of Huntington <br />Paula Fell — Project Manager <br />Beach, Water Well <br />Study for the <br />Beach, Public Works <br />Derrick Coleman — CEQA <br />Project Initial Study <br />construction of a new <br />Contact: Andrew <br />Planner <br />Westminster, CA <br />water well and <br />Ferrigno, PE, Principal <br />Kevin Fowler— Noise <br />2017 <br />associated pipeline. <br />Civil Engineer <br />Jenna Farrell —Cultural <br />Phone:714.536.5291 <br />Resources <br />Email: aferrigno@surf- <br />hb.org <br />4. TETRA TECH CURRENT <br />PROJECTTABLE <br />RELEVANT <br />Project,Completion <br />D. <br />Washington Avenue <br />Providing engineering <br />City of Santa Ana, <br />Paula Fell — CEQA Task Lead <br />Well Project IS/MND <br />design services and <br />Public Works Agency <br />Derrick Coleman — CEQA <br />651-657 East <br />preparing an IS/MND for <br />Contact: Armando <br />Support, Quality <br />Washington Avenue, <br />the development of a <br />Fernandez, PE, <br />Assurance/Quality Control <br />Santa Ana, CA <br />new water well. <br />Senior Civil Engineer <br />Jenna Farrell —Cultural <br />On -going <br />Phone:714.647.5629 <br />Resources <br />Email: <br />Afemandez@santa- <br />ana.org <br />First Street <br />Preparing a CATEX <br />City of Santa Ana <br />Paula Fell — Project Manager <br />Stabilization Project <br />and backup <br />Contact: Craig Foster, <br />Derrick Coleman — CEQA <br />CATEX <br />documentation for <br />CPSWQ, QSD/P <br />Support, Quality Assurance/ <br />East First Street, <br />improvements to <br />NPDES Manager <br />Quality Control <br />Santa Ana, CA <br />stabilize existing slopes <br />along East First Street. <br />Phone: 714.647.5659 <br />Amanda Beck — Biological <br />On -going <br />Email: Cfoster@santa- <br />Resources <br />ana.org <br />Jenna Farrell — Cultural <br />Resources <br />Well 12, Well 14, <br />Providing mitigation <br />Mesa Water District <br />Paula Fell — CEQA Project <br />and Pipeline Project <br />support for the <br />Contact: Phil Lauri, PE <br />Manager <br />Mitigation Support <br />construction of two new <br />Assistant General <br />Jenna Farrell — Cultural <br />Santa Ana, CA <br />water supply wells and <br />Manager <br />Resources <br />pipelines. <br />On -going <br />Phone: 949.631.1291 <br />Amy Noddings —Biological <br />Email: <br />Resources <br />phil@mesawater.org <br />City of Santa Ana 13 TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.