Laserfiche WebLink
Task 1.6 100% Design Development— Incorporating feedback from the 75% Design Development Review <br />? 0. f ' ���`�� n <br />Meeting, Spohn Ranch will refine the conceptual design to a 100% Design Development level. <br />. a t998 <br />Task 1.6 Deliverable <br />••....• <br />0 3D Renderings(JPEG) <br />SPOHN RANCH. ANC. <br />o Labeled & Scaled 2D Site Plan (PDF) <br />P U26 5EW <br />W6 HNRANCH.Gom <br />o Construction Cost Estimate (PDF) <br />E INFOOSPOHNRANCH <br />MPA S OENRNEIA AW <br />105 ANGELES, CA <br />0 2D Base (AutoCAD) <br />LET'S ROIL. <br />PHASE 2 —CONSTRUCTION DOCUMENTS <br />Task 2.1 Construction Documents Kick -Off Meeting —Spohn Ranch will lead a virtual meeting with the <br />p <br />Client to review 100% Design Development, special requirements and points of coordination. <br />• Task 2.1 Deliverable <br />o Meeting Minutes (PDF) <br />Task 2.2 90% Construction Documents—Spohn Ranch will prepare professional construction documents <br />detailing the skatepark-specific site improvements. <br />• Task 2.2 Deliverable (PDF & AutoCAD) <br />o <br />Information Plan <br />0 <br />3D Perspective <br />o <br />Layout Plan <br />o <br />Steel Plan <br />o <br />Jointing Plan <br />o <br />Grading & Drainage Plan <br />o <br />Sections <br />o <br />Construction Details <br />o <br />Technical Specifications <br />The Client will provide a title block and site base in AutoCAD format. Spohn Ranch will coordinate with the <br />Client on other aspects of the construction documents such as access pathways, landscaping, etc. <br />Task 2.3 90% Construction Documents Review Meeting —The Client will review the 90% Construction <br />Documents submittal and prepare redline comments. Spohn Ranch will lead a virtual meeting with the <br />Client to review the redline comments and identify actions necessary to address the comments. <br />• Task 2.3 Deliverable <br />o Meeting Minutes (PDF) <br />Task 2.4 100% Construction Documents— Spohn Ranch will incorporate feedback from the 90% <br />Construction Documents Review Meeting and prepare a 100% Construction Documents submittal sealed by <br />a CA -licensed structural engineer. <br />• Task 2.4 Deliverable <br />o 100% Construction Documents (PDF & AutoCAD) <br />uKI0® @SP'OHNRANCH <br />