Laserfiche WebLink
Proposal to Prepare a Geotechnical Investigation Report <br />10th and Flower Park <br />Southeast Corner of 10th Street and Flower Street <br />City of Santa Ana, Orange County, California <br />February 21, 2023 <br />Page 3 <br />The borings will be backfilled with cement grout (if ground water is encountered) and soils <br />cuttings and compacted by pushing down with augers. Where asphalt concrete is penetrated, <br />the surface will be patched with cold mixed asphalt concrete. It is possible the surface may <br />settle overtime. If construction is delayed, we recommend the owner monitor the boring site and <br />backfill any settlement or depression that might occur or provide protection around the area of <br />the boring locations to prevent trip and fall injuries from occurring near the area of any potential <br />settlement. <br />Environmental Analytical Testing for Soil Sample <br />One composite soil sample from the excess soil cuttings will be submitted to a California ELAP <br />certified laboratory under chain -of -custody control. All sample analyses will be conducted on a <br />standard turnaround time. The samples will be analyzed as follows: <br />• EPA 8015M — TPH carbon chain speciation <br />• EPA 8260 — VOCs and Oxygenates <br />• EPA 8270 — SVOCs <br />• EPA 8082 — PCBs <br />• EPA 8081A — OCPs <br />• EPA 6010B — Title 22 metals (TTLC) <br />Waste Disposal <br />All excess soil cuttings will be contained in five (5) drums. The drums will be temporarily stored <br />on the site away from drainage areas and secured from unauthorized entry until laboratory <br />analytical results are received. The waste will be profiled for the most cost-effective disposal or <br />recycling option. For budgeting purposes, we have assumed five (5) drums of waste will need to <br />be transported and disposed of as non -hazardous waste. <br />Converse will be responsible for the preparation of waste manifests, and for arranging for proper <br />transportation and disposal of the waste. A Client representative will be responsible for signing <br />the manifests as the Generator. Copies of the manifest will be provided. <br />Task 3: Percolation Testing <br />The purpose of the Infiltration test will be to obtain water infiltration rate of the surface soils at <br />the location of surface runoff discharge. <br />We will conduct infiltration testing at one location. The depth of the infiltration test will be at 10.0 <br />feet bgs. <br />A 2-inch diameter perforated PVC pipe will be installed inside the boring. The pipe will be <br />secured in the borehole and pea gravel filter pack will be poured down the borehole to surround <br />the pipe casing and hole bottom. Water will be added to the borehole until the water level is as <br />near the ground surface as can be achieved and allowed to pre-soak. <br />Pre -Soaking <br />Pre-soaking will be done by inundating the borehole with water for at least one hour. <br />® <br />Converse Consultants <br />R:\2023\32\23-32-103 23-32-103 DEA, 10th and Flower Park, Santa Ana (RFP 22-124)\Proposal123-32-103_pro(01)parks <br />