My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID EVANS AND ASSOCIATES (3)
Clerk
>
Contracts / Agreements
>
D
>
DAVID EVANS AND ASSOCIATES (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 8:41:42 AM
Creation date
5/22/2023 4:40:12 PM
Metadata
Fields
Template:
Contracts
Company Name
DAVID EVANS AND ASSOCIATES
Contract #
A-2023-073
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
8/16/2024
Insurance Exp Date
12/1/2025
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Prepare a Geotechnical Investigation Report <br />1011 and Flower Park <br />Southeast Corner of 10th Street and Flower Street <br />City of Santa Ana, Orange County, California <br />February 21, 2023 <br />Page 5 <br />• Depth to groundwater (if encountered) and its impact on the proposed development. <br />■ Discussion on the laboratory tests result. <br />■ Water percolation rates. <br />• Faulting and seismicity. <br />• Design seismic coefficient based on the 2022 CBC. <br />• Discussion of the secondary effects of earthquakes. <br />• Grading recommendations, including removal of unsuitable soils. <br />■ Shrinkage and subsidence coefficients. <br />■ Excavatability of site soils. <br />■ Structural backfill recommendations. <br />• Soils bearing pressure for shallow foundation design. <br />• Static and seismic lateral earth pressures. <br />• Light pole foundation recommendation <br />• Asphalt and cement concrete pavement design. <br />SCHEDULE/DELIVERABLES <br />We will initiate our scope of work within approximately one week after notice to proceed is <br />received, although it is subject to receiving permit, driller availability, weather, and other factors <br />beyond Converse's control. One day will be required to complete the fieldwork. <br />A PDF copy of the report will be issued within 4 weeks after field work is completed. Hard <br />copies of the report can be provided upon the client's request. <br />® Converse Consultants <br />R:\2023\32\23-32-103 23-32-103 DEA, 10th and Flower Park, Santa Ana (RFP 22-124) \Proposal/23-32-103_pro(01)parks <br />
The URL can be used to link to this page
Your browser does not support the video tag.