Laserfiche WebLink
<br />for <br /> <br />acre <br />- <br />Santa Ana <br /> <br />ommercial <br />and offsite <br /> <br />City of <br />- <br />addendum <br />foot c <br />unit condominium <br />- <br />- <br />those not discussed in <br /> <br />– <br />planned community. The <br />square <br />- <br />- <br />undeveloped and part of <br /> <br />ram EIR, which was certified in <br />language translation services at <br />- <br /> <br />D also coordinated the preparation <br /> Dobreva also managed an extensive <br /> <br />Working on behalf of the Department <br />Ms. Dobreva was lead preparer of an <br />The project includes construction of <br /> <br />Ms. Dobreva prepared the Supplemental <br /> <br />acre project site was <br /> <br />-resources. <br />was lead preparer of an EIR <br /> <br /> <br />ntial development sites in order to minimize future <br />is lead preparer of an EIR and coordination with <br /> <br /> <br /> <br />16 <br />ion Project MND. <br />Ms. Dobreva prepared environmental documentation for <br />Dobreva <br />Dobreva <br />portunity Study EIR was the most appropriate and defensible <br />Ms. Dobreva was lead preparer of an EIR for a Specific Plan <br /> <br /> <br />Ms. <br />Ms. <br />t include biological resources, energy, greenhouse gas emissions, <br />Ms. Dobreva is lead preparer of an EIR that is proposed to <br /> <br /> <br />Review <br />Peer <br />Ms. Dobreva was lead preparer of an MND for a 140 <br />acre site developed with offices into a 114,000 <br />- <br /> <br />Use Project EIR. <br />- <br /> <br />EPD is also managing the preparation of technical studies in support of the EIR. <br /> <br />Whisler Ranch EIR Addendum. <br />Shea/Baker Ranch Area Plan Supplemental EIR. <br /> <br /> <br />- <br />mmunity meetings with adjacent residents. EPD also conducted workshops with city staff - <br />and Technical Study <br /> <br />family detached homes on a hillside located west of the intersection of Osterman Road and <br />Program EIR. <br />- <br />Palomino Business Park EIR. <br />Village 605 EIR Addendum. <br /> <br />Bowery Mixedfirm Vintage Lofts MND. <br /> <br />Metropolitan State Hospital Modernizat <br />Claremont General Plan Housing Element EIR Addendum. <br /> <br />Colony Commerce Center East EIR. <br /> <br /> <br /> <br />- <br />– <br />acre project site was one of seven sites analyzed in the OSA Prog <br />-- <br />-EPD also managed the preparation of technical studies in support of the EIR. Important areas of - <br />- <br />- <br />d City Council after thoughtful staff presentation. <br />te. <br />awarded the 2019 Award of Merit for Economic Planning and Development from the Orange Section of the American Planning Association for its work on the project.EPD the City of Santa Ana <br /> to accommodate the addition of 1,150 residential units, as well as a total of 80,000 square feet of retail and restaurant commercial space. EPof the technical studies and environmental <br /> documents, including the traffic impact analysis, which include 57 intersections within the Cities of Santa Ana, Tustin, and Irvine. EPD of General Services (DGS)/Department of State <br /> Hospitals (DSH), Ms. Dobreva served as lead preparer of a MND in support of a modernization project at this institution in Norwalk. EPD conducted multiple coand a public hearing on <br /> behalf of DGS/DSH, and provided Spanishcommunity meetings and issued bilingual publications and notices.Other EIR (SEIR) for the Opportunities Study Area (OSA) Shea/Baker Ranch master3862008. <br /> An SEIR tiered off the OSA Program EIR was prepared to streamline the CEQA processes, focusing the analysis in the areas of air quality and Global Climate Change the OSA Other firm <br /> 68 singleRegency Lane in Lake Forest. The approximately 13the Lake Forest Opportunities Study EIR. After the Initial Study was completed and the most major issues (aesthetics, noise, <br /> and biological issues to name a few) were thoroughly analyzed, it was determined that an Addendum to the Opapproach because the project’s environmental issues did not require new mitigation <br /> measures. This expedited the environmental review and the project was promptly approved by Planning Commission an EPD and related development entitlements for over 1.9 million square <br /> feet of industrial uses on a 94siimpact assessment included historic resources within the Ontario Ranch, health risks and residential adjacencies, tribal cultural resources, and biological <br /> EPD redevelop approximately 110 acres of land within the City of Norco for a new business park that would provide industrial, commercial, and office uses. approximately 2.05 million <br /> square feet of new building space and related onimprovements.Important areas of impact assessmenand hydrology and water quality. EPD development replacing an industrial use in Old Town <br /> Tustin. Ms. public outreach process to obtain community support.EPD redevelopment of a 9.6center.EPD EIR addendum for the City of Claremont’s General Plan Housing Element update. The <br /> addendum provides a detailed analysis of two potential resideanalysis requirements for affordable housing development on those sites. Required close coordination with the City Attorney <br /> and analysis of traffic impacts. <br /> <br />Proposal for CEQA Related Bristol Specific Plan <br /> <br />