Laserfiche WebLink
<br />s in <br />The <br /> <br />. <br />range <br />- <br /> <br />Santa Ana <br /> <br />station <br />City of <br />building form, <br /> <br />ented towards <br />s <br />and long <br /> <br /> <br />- <br /> <br />ted development, and <br />SF of parks and open <br /> <br />orien <br />- <br />Passenger Rail line <br />280,000 <br />Arrow <br /> <br />acre community college campus. The <br />- <br /> <br /> <br />2,400 residential units, 265,000 square feet <br />(SBCTA) <br />term vision for compact, efficient, responsible, <br />- <br /> <br />based code, the TVSP emphasize <br />- <br />Environmental Impact Report (EIR) in support of a <br /> <br /> <br />related documents, including short <br />- <br /> <br />20 <br /> <br />220 hotel rooms and <br />ocumentation. A full listing of documents follows: <br /> <br /> <br />(TVSP) <br /> <br /> <br />The TVSP includes <br /> <br /> <br />Drainage Plans and construction oversight <br />the community’s long <br />SF of office, Review <br /> <br />Specific Plan <br /> <br /> <br /> <br />Peer <br /> <br />Environmental Impact Report <br /> <br />uality & Greenhouse Gas Report <br /> <br />238,000 <br /> <br />Water Quality Management Plan Water Supply Assessment Air QCultural & Paleontological Resources Report Energy Noise Impact Analysis VMT Screening Water Supply Assessment <br />regulations for <br />Redlands <br /> <br /> <br /> <br />working with the South Orange County Community College District prepare the <br />sets <br /> <br /> <br /> <br />an area which covers approximately 947 acres (approximately 1.48 square miles) <br />City of Santa AnaCity of <br />the Transit Villages <br />and Technical Study <br />Range Plan <br />Range Academic and Facilities PlanRange Facilities Plan <br />- <br />TVSP <br />-- <br /> <br />San Bernardino County Transportation Authority <br />The <br /> ShortLongLongConcept PlanMitigated Negative Declaration, EIR addenda, and other CEQA documentationDemolition, Utility, Grading, and Water Quality Management Plans (WQMPs) and Stormwater <br /> Pollution Prevention Plans (SWPPPs) <br />retail commercial, <br />Redlands <br /> <br /> <br />new <br /> <br />of <br />ate, EPD staff has prepared a range of project <br />Client:Transit Villages Specific PlanCity of EPD prepared Specific Plan for Project area is divided into three planning areas referred to as transit villages, which generally surround <br /> threethe City.and environmentally sustainable development. As a forma mix and density of different uses, strong pedestrian orientation and transitpublic realm improvements and amenities.(SF) <br /> space. Technical Studies:Client:Advanced Technology & Education Park (ATEP)City of Tustin The EPD team is environmental documentation and permitting for ATEP, a new 60project is located <br /> on the decommissioned Marine Corps Air Station Tustin and is oritechnology and occupational training. EPD communicated this vision to a broad range of local, State, and federal agencies, <br /> including the Department of the Navy and Division of the State Architect in addition to SOCCCD and City of Tustin.To dplans for site facility development, a concept plan document (similar <br /> in scope to a specific plan) for City of Tustin approval, as well as the environmental d <br /> Proposal for CEQA Related Bristol Specific Plan <br /> <br />