Laserfiche WebLink
<br />Santa Ana <br /> <br />City of <br />for several of the tasks, costs are conservative. <br /> <br /> <br />24 <br />everal of the tasks include hourly rates that are not to exceed <br />. S <br />Review <br />Peer <br />month contingency <br />- <br /> <br /> <br /> <br />following budget for the above scope of work. This budget assumes a review period of <br />plus a 6 <br />and Technical Study <br /> <br />BUDGET <br />the specified amount. Based on level of effort required <br /> <br />III.EPD proposes the up to 12 months(NTX) Reimbursement would be provided for unused time. Fixed fee tasks would be billed out at the end of task or project completion. Proposal for <br /> CEQA Related Bristol Specific Plan <br /> <br />