Laserfiche WebLink
Orozco, Norma <br /> From: Michael Flores <mflores@spectrumcm.com> <br /> Sent: Monday, June 05, 2023 4:21 PM <br /> To: eComment <br /> Cc: Kyle Kitchens; Robert Verdugo; Ray Tober <br /> Subject: 2333 N. Broadway, Santa Ana Consultant - Urgent 5G Cellular Safety Concerns <br /> [Council Public Comments] <br /> Attachments: Verizon 2022 Leased Area Planning 07.21.22.pdf,4G - 5G Radiated Output Power <br /> Bloom VEROS Santa Ana.pdf, Veros & Santa Ana - Verizon 5G Safety Concerns.pdf; <br /> FCC 5G Public Safety Requirements - SCM 2023.pdf <br /> City Council Members, <br /> I am a 30-year cellular developer and radio frequency expert. I was hired to safeguard the occupants of the Veros <br /> facility and the rooftop workers 4-years ago by the ownership of the property, Broadway Investment Group. My partner <br /> Kyle Kitchens is a 45-year radio frequency engineer. Kyle reviews every electromagnetic radiation compliance report <br /> with a fine-tooth comb and has become one of the nation's leading experts on 5G safety. Over the past three plus years <br /> I've witnessed AT&T go above and beyond the call of duty on the Veros rooftop for FCC compliance safety. Verizon <br /> Wireless has been a polar opposite experience. <br /> As a result of Verizon's failure to meet the safety requirements of the landlord's lease,we had no choice other than to <br /> terminate their lease with the landlord when it expired in July of 2022. Look at the power of the 5G radiation beam in <br /> the attached output map. Since terminating Verizon,they have failed to vacate the property blaming the city for its <br /> delays claiming the city is failing to issue Verizon a decommissioning permit. To compound the concerns, Verizon <br /> Wireless has convinced the city to allow for the development of a new cell site at the motel (see Veros &Santa <br /> Ana). The motel owner likely took a check for 20k for the new"First Responder"vehicle in the motel parking lot. The <br /> money is great, but not when you just voided your entire general liability insurance policy. <br /> We are not certain if Verizon is claiming a 6409a right to build position or what is going on here. What we do know is <br /> that the deception is at an all time high. The city should not allow for the relocation of the cell site to the motel parking <br /> lot without a thorough safety assessment and without the city residence approval. The current cell site does not meet <br /> OSHA setback requirements and will cause the owners General Liability insurer to cancel the policy. <br /> Our team has over 100-years of combined cellular knowledge. We manage hundreds of cellular locations throughout <br /> the U.S. This Santa Ana 5G safety matter is very serious! <br /> Please help! <br /> Michael Flores <br /> Chief Executive Officer <br /> Office: (562) 799-5570 <br /> Mobile: (949)683-7101 <br /> www.spectrumcm.com <br /> The content of this email is confidential and intended for the recipient specified in message only. If you received this <br /> message by mistake,please reply to this message and follow with its deletion,so that we can ensure such a mistake does <br /> not occur in the future. <br /> i <br />