My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-06-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Agenda Packet_2023-06-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 2:47:55 PM
Creation date
6/2/2023 10:43:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EcoCenter Team Responsibilities <br />The following list identifies roles and input required from the client team: <br />i Participate in bi-weekly team UPDATE meetings <br />l Review and approve fabrication submittals <br />Review and approve graphic PDF proofs <br />Review and approve AV submittals <br />Color-Ad/EcoCenter Team <br />3.1 Virtual meetings to address details <br />Task: Host periodic virtual meetings, address aspects of project detailing, coordination & production, <br />for EcoCenter client update and critical reviews / input. <br />3.2 Prepare shop drawings, prototypes, and samples <br />Task: Develop technical documents / drawings / samples to show the various production categories. <br />3.3 Graphic design layouts / proofing for Client sign -off <br />Task: Develop, graphic pre -production documents drawings for EcoCenter review, signoff. <br />3.4 Material Samples Submitted for Approval <br />Task: Develop, material samples submittals pre -production for EcoCenter review, signoff. <br />3.5 Graphic Print Samples for Approval <br />Task: Develop, graphic samples pre -production for EcoCenter review, signoff. <br />3.6 Purchasing /securing materials and AV equipment <br />Task: Proceed to material orders / AV hardware purchases as required to fabricate agreed design. <br />3.7 Production of all Exhibits and Graphics <br />Task: Proceed into the production activities for the exhibit features and graphics. <br />3.8 Audio Visual Production as required <br />Task: Proceed into the production activities for the Media exhibit items / software production. <br />3.9 Crate Fabrication <br />Task: Build cases / crates as required to suit transport of the exhibits, graphics and media to EcoCenter <br />site. <br />3.10 Final Viewing of All Components virtually <br />Task: Host periodic virtual meetings, for EcoCenter client update, to witness shop reviews, exhibits in <br />production. <br />3.11 Adjustments to Exhibits as Required <br />Task: Fine-tuning of exhibits, graphics, media prior to shipping to the EcoCenter site. <br />P Odbrr <br />39 Reich&Patch SIGNS AND EXHIBITS <br />City Council 29 — 54 6/6/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.