CITY OF SANTA ANA
<br />RFP NO.: 22-096
<br />ON CALL EMERGENCY ASPHALT & PCC
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore
<br />Item No. 4 - Adjust Manhole to Finished Grade
<br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed in the
<br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 5 - PCC Curb & Gutter (A-2-8)
<br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter and shall
<br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs,
<br />Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard
<br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the City for each Task
<br />Order.
<br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed in the
<br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 6 - Signing & Striping
<br />The work under this item for Signing and Striping shall be in accordance with the latest CA MUTCD, Caltrans
<br />and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents to be
<br />provided for each Task Order Work.
<br />Payment for Signing & Striping shall be at the contract Lump Sum listed in the Fee Proposal, and shall include
<br />full compensation for doing all work, including furnishing all materials, labor, equipment, tools, disposal of all
<br />removed materials and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 7 — Traffic Control
<br />The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, CA
<br />MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract
<br />Documents to be provided for each Task Order Work.
<br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee Proposal,
<br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools,
<br />and incidentals as required and no additional compensation will be allowed therefore.
<br />Sample Task Order B Items of Work
<br />Item No. I - Unclassified Excavation
<br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal,
<br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools,
<br />and incidentals as required and no additional compensation will be allowed therefore.
<br />Page 5 of 8
<br />
|