Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />• DEFINITION OF ITEMS (SAMPLE TASK ORDERS A B & Q: <br />• The unit prices paid for the items listed in the Contractor's Proposal as defined herein include full <br />compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in <br />furnishing and installing the materials complete and in place, in accordance with the details shown in the <br />Task Order, Standard Plans, Sketch, Other Plans, as directed by the Engineer. <br />• All incidental work which is not otherwise specified, and which is necessary to complete the improvements <br />shall be furnished and installed as though such work was specified, and no additional compensation would <br />be allowed therefore. If not stated otherwise, work shall be in conformance to APWA's 2012 Greenbook <br />specifications. <br />• Each Sample Task Order's work items include, but are not limited to, the following listed below for the Fee <br />Schedule Submittal. Actual Task Order work, ifgranted, will generally be on a Time and Materials basis in <br />accordance with labor rates for the type of work and material required per Task Order granted and <br />according to the schedule of rates provided as part of this proposal. The Sample Task Order information <br />provided will primarily be used to compare various proposals. <br />Sample Taslt Order A Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal, <br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - Asphalt Concrete (AC) Pavement <br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable subgrade materials <br />shall be paid for at the contract unit price bid per ton. <br />Item No. 3- Furnish and Install New #6 Pull Box <br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA <br />MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract <br />Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and <br />any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and <br />no additional payment will be allowed therefore. <br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />Page 4 of 8 <br />