CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation <br />Item No. 2 - PCC Sidewalk (T=411) <br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC Sidewalk <br />shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete <br />Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," of the Standard <br />Specifications, plans, and contract document specifications. <br />Payment for PCC Sidewalk (T=4") shall be at the contract unit price bid per Square Foot as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. Payment <br />for thickness (T=6") shall be paid 1.5 times the unit price. <br />Item No. 3 - PCC Curb Ramp <br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter and shall <br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, <br />Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard <br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />Payment for PCC Curb Ramp shall be at the contract unit price bid per Linear Foot as listed in the Fee Proposal, <br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 4 - PCC Curb & Gutter (A-2-8) <br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter and shall <br />be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, <br />Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard <br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed in the <br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 5- Furnish and Install New #6 Pull Box <br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA <br />MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract <br />Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and <br />any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and <br />no additional payment will be allowed therefore. <br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as listed in <br />Page 6 of 8 <br />