My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (2)
Clerk
>
Contracts / Agreements
>
V
>
VIDO SAMARZICH, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:57:00 AM
Creation date
6/2/2023 1:28:26 PM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
A-2023-076-05
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
5/1/2023
Insurance Exp Date
11/9/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />Sample Task Order B - Concrete Paving <br />Item <br />Description3Fence5o <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation550 <br />CY <br />2 <br />PCC Sidewalk T=4")2,500 <br />SF <br />3 <br />PCC Curb Ram3,000 <br />SF <br />4 <br />PCC Curb and Gutter (Type-100 <br />LF <br />5 <br />Furnish and Install #6 P4 <br />EA <br />6 <br />Adjust Manhole to Finis5 <br />EA <br />7 <br />Catch Basin (Type `B," <br />1 <br />EA <br />8 <br />Remove and Replace 30rPi e <br />75 <br />LF <br />9 <br />Guard Rail Replacement) <br />50 <br />LF <br />10 <br />Guard Rail Replacement) <br />1 <br />EA <br />11 <br />Remove and Replace Ch <br />5o <br />LF12 <br />Concrete Barrier T e 8350 <br />LF13 <br />Traffic Control Work1 <br />LS <br />SURETY BOND <br />For each Task Order Issued by Public Works Agency, the City may or may not require the Contractor to provide <br />cash deposit or surety "Payment" and "Performance" bond. Depending upon the size, nature and risk of the <br />work, the City may use the amounts specified by the "Greenbook," surface drainage or street improvement plan <br />measurements, or the approved itemized cost for each On -call or Emergency Task Order to calculate bond <br />amounts, if any. Task Order work shall be per the City's Standard Plans, As -Built Plans, or other direction from <br />the Public Works Agency. If required for a Task Order, the cash deposit or the surety bonds shall guarantee the <br />construction of all necessary improvements for the Task Order, however, Bid Bonds were not required at the <br />time of the submittal of RFP Proposal. For Task Orders, the City also reserves the right to retain 10% of <br />progress pay amounts for the one-year warranty work. If so, the cash deposit shall be released approximately 135 <br />days after all related permits and/or other approvals required are signed off by the City's Construction Inspector, <br />and the passage of any lien periods. In the event the work is not completed within one year of the date that a street <br />work permit or Task Order is signed, applicant agrees that the City may apply the cash deposit to the cost of <br />completing the work and such work may be completed at the sole convenience of the City of Santa Ana. <br />CONTRACTOR RESPONSIBLITIES <br />Contractor must be able to respond to City's request for emergency repair work on a timely and urgent manner. <br />The contractor shall be available on an on -call basis, 24/7, and ready to respond in the event of an <br />emergency. Service calls shall be responded within one hour. Contractor's repair crews must be able to <br />arrive at job site within 8 hours of approval from City to commence work. Regular business hours are <br />considered from 7:00 am to 5:00 pm (Monday through Friday). Anytime outside of business hours of operation <br />may be considered after hours/weekends. <br />The Contractor shall, prior to award of contract and without additional expense to the City, possess all licenses <br />and permits (unless waived by the City) required for the performance of the work required by this contract, <br />including but not limited to a California Class (A, C-8 or C34) Contractor's license and a City of Santa Ana <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.