My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (2)
Clerk
>
Contracts / Agreements
>
V
>
VIDO SAMARZICH, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:57:00 AM
Creation date
6/2/2023 1:28:26 PM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
A-2023-076-05
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
5/1/2023
Insurance Exp Date
11/9/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />• DEFINITION OF ITEMS (SAMPLE TASK ORDERS A, B & Cl: <br />• The unit prices paid for the items listed in the Contractor's Proposal as defined herein include full <br />compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in <br />furnishing and installing the materials complete and in place, in accordance with the details shown in the <br />Task Order, Standard Plans, Sketch, Other Plans, as directed by the Engineer. <br />• All incidental work which is not otherwise specified, and which is necessary to complete the improvements <br />shall be furnished and installed as though such work was specified, and no additional compensation would <br />be allowed therefore. If not stated otherwise, work shall be in conformance to APWA's 2012 Greenbook <br />specifications. <br />• Each Sample Task Order's work items include, but are not limited to, the following listed below far the Fee <br />Schedule Submittal. Actual Task Order work, if granted, will generally be on a Time and Materials basis in <br />accordance with labor rates for the type of work and material required per Task Order granted and <br />according to the schedule of rates provided as part of this proposal. The Sample Task Order information <br />provided will primarily be used to compare various proposals. <br />Sample Task Order A Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal, <br />and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, <br />and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - Asphalt Concrete (AC) Pavement <br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable subgrade materials <br />shall be paid for at the contract unit price bid per ton. <br />Item No. 3- Furnish and Install New #6 Pull Box <br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA <br />MUTED, Caltrans and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract <br />Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and <br />any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and <br />no additional payment will be allowed therefore. <br />Payment for Furnish and Install New 46 Pull Box shall be at the contract unit price paid per Each as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.