CITY OF SANTA ANA
<br />RFP NO.: 22-096
<br />ON CALL EMERGENCY ASPHALT & PCC
<br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 6 - Adjust Manhole to Finished Grade
<br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed in the
<br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor,
<br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.
<br />Item No. 7- Catch Basin (Type "B," W=101)
<br />The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall be in
<br />accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-1, "Concrete Structures"
<br />and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by
<br />the City for each Task Order.
<br />Payment for Catch Basin (Type "B," W=10') shall be at the contract unit price paid per Each as listed in the Fee
<br />Proposal, and shall include frill compensation for doing all work, including removal or replacement of existing
<br />catch basins and/or other appurtenances, including furnishing all materials, labor, equipment, tools, and
<br />incidentals as required to construct a new catch basin, soil preparation and compaction, and no additional
<br />compensation will be allowed therefore.
<br />Item No. 8 — Remove and Replace 30" Reinforced Concrete Pipe
<br />The work under this item consists of grading, compacting Subgrade, and constructing Remove and Replace 30"
<br />Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground Conduit
<br />Construction" and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents
<br />provided by the City for each Task Order.
<br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid per
<br />Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as
<br />required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore.
<br />Item No. 9 — Guard Rail Replacement (Caltrans RSP A77N4)
<br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail Replacement
<br />(Caltrans RSP A77N4) and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation,"
<br />with the provisions of Section 204, "Lumber and Treatment with Preservatives," Section 304-2.2 "Flexible Metal
<br />Guard Rail," any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents
<br />provided by the City for each Task Order.
<br />Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit price paid per Linear
<br />Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or
<br />replacement of existing guard rail, furnishing all materials, labor, equipment, tools, and incidentals as required to
<br />install new guardrail, foundation preparation, and no additional compensation will be allowed therefore.
<br />Page 7 of 8
<br />
|