Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 6 - Adjust Manhole to Finished Grade <br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed in the <br />Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Item No. 7- Catch Basin (Type "B," W=10') <br />The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall be in <br />accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-1, "Concrete Structures" <br />and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by <br />the City for each Task Order. <br />Payment for Catch Basin (Type "B," W=101) shall be at the contract unit price paid per Each as listed in the Fee <br />Proposal, and shall include frill compensation for doing all work, including removal or replacement of existing <br />catch basins and/or other appurtenances, including furnishing all materials, labor, equipment, tools, and <br />incidentals as required to construct a new catch basin, soil preparation and compaction, and no additional <br />compensation will be allowed therefore. <br />Item No. 8 — Remove and Replace 30" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting Subgrade, and constructing Remove and Replace 30" <br />Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground Conduit <br />Construction" and any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents <br />provided by the City for each Task Order. <br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid per <br />Linear Foot as listed in the Fee Proposal, and shall include frill compensation for doing all work, including <br />removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as <br />required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore. <br />Item No. 9 — Guard Rail Replacement (Caltrans RSP A77N4) <br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail Replacement <br />(Caltrans RSP A77N4) and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," <br />with the provisions of Section 204, "Lumber and Treatment with Preservatives," Section 304-2.2 "Flexible Metal <br />Guard Rail," any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents <br />provided by the City for each Task Order. <br />Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit price paid per Linear <br />Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or <br />replacement of existing guard rail, furnishing all materials, labor, equipment, tools, and incidentals as required to <br />install new guardrail, foundation preparation, and no additional compensation will be allowed therefore. <br />Page 7 of 8 <br />