My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRIFFIN STRUCTURES
Clerk
>
Contracts / Agreements
>
G
>
GRIFFIN STRUCTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 4:06:06 PM
Creation date
6/8/2023 4:41:10 PM
Metadata
Fields
Template:
Contracts
Company Name
GRIFFIN STRUCTURES
Contract #
A-2023-102
Agency
Library
Council Approval Date
6/6/2023
Expiration Date
12/31/2025
Insurance Exp Date
12/31/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. STATEMENT OF QUALIFICATIONS <br />Cupertino Library Expansion <br />CUPERTINO, CA <br />GRIFFIN STRUCTURES I 20 <br />This library project, completed in 7anuary of 2022, was envisioned to be a two- <br />story addition at the southern end of the building. The existing 1,175 SF single story <br />Children's Book area was demolished and replaced with a new 5,626 SF two-story <br />addition that connects to the existing structure. In addition, this project expanded the <br />size of the existing Story Room and created a multi -purpose Program Room. The new <br />Program Room can be partitioned into smaller rooms allowing for simultaneous use. <br />County of Orange Civic Center <br />SANTA ANA, CA <br />This 20-year civic center master plan was developed and managed by Griffin <br />Structures and completed in July of 2022. This project was intended to improve the <br />County's operational efficiency by unifying departments in a central facility. The <br />Administration North and recently completed Administration South encompass over <br />500,000 SF and was completed ahead of schedule and under budget by $8.1M. <br />VALUE + SIZE <br />$8M 1 6,000 SF <br />RELEVANCY <br />Library; Public Project <br />CLIENT + CONTACT <br />City of Cupertino <br />Roger Lee <br />Former Public Works Director <br />(408) 234-8494 <br />roger.lee5@yahoo.com <br />VALUE + SIZE <br />$400M 1 500,000 SF <br />RELEVANCY <br />Local Project; Public Project <br />CLIENT + CONTACT <br />County of Orange <br />Frank Kim <br />County Chief Exec. Officer <br />(714) 834-4304 <br />frank.kim@ocgov.com <br />AWARDS <br />LEED Silver; Sustainable <br />Design Award; APWA <br />Regional Project of the Year; <br />PCI Sustainable Design <br />Award <br />GRIFFIN <br />STRUCTURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.