Laserfiche WebLink
Schedule of Fees <br />All field services charge <br />Reeular Work Hours <br />First 8 hours, Monday through Friday, between 5:00 a.m. to 5:00 p.m. <br />Direct Project expenses outside services will be charged at Cost+ 15%. <br />Time and One -Half <br />Any increment past first 8 hours through 12 hours, Monday through Friday <br />First 12 hours on Saturday <br />Shift between 3:00 a.m. and 5:00 a.m. <br />Double Time <br />Any hours past 12 hours Monday through Saturday, all day Sunday and Federal Holidays <br />Field Analysis <br />Code <br />Item <br />$/Unit <br />Unit <br />G200 <br />Soil Boring with Hollow Stem Auger Drilling Portal to Portal <br />$ <br />415.00 <br />Hour <br />G201 <br />Backfill Boreholes with Bentonite <br />$ <br />26.00 <br />Foot <br />G202 <br />Backfill Boreholes with Grout <br />$ <br />37.00 <br />Foot <br />G203 <br />Drumming and Disposal of Clean Cuttings <br />$ <br />410.00 <br />Drum <br />G204 <br />Fire Water Buffalo <br />$ <br />578.00 <br />Day <br />G205 <br />Support Truck <br />$ <br />158.00 <br />Day <br />G206 <br />Water Truck <br />$ <br />473.00 <br />Day <br />G207 <br />Mobilization and Demobilization for Rock coring <br />$ <br />1,208.00 <br />Each <br />G208 <br />Rock Coring <br />$ <br />478.00 <br />Hour <br />G209 <br />Decontamination of Vehicle and Equipment (Up to 100 miles) <br />$ <br />315.00 <br />Each <br />G210 <br />Field Resistivity, up to 3 arrays, maximum distance of 40 ft. <br />$ <br />1,890.00 <br />Each <br />G211 <br />Environmental Soil Boring with Hollow Stem Auger Portal to Portal <br />$ <br />446.00 <br />Hour <br />G212 <br />Environmental Soil Boring with Direct Push Portal to Portal <br />$ <br />399.00 <br />Hour <br />G213 <br />Environmental Groundwater Sampling with Grundfos, Portal to Portal <br />$ <br />289.00 <br />Hour <br />G214 <br />Environmental Analysis of soil for waste classification <br />Quote/Sample <br />G215 <br />Environmental Analysis of liquid for waste classification <br />Quote/Sample <br />G216 <br />Ground Resistance Tester (Four Point Method), plus travel <br />$ <br />1,700.00 <br />Each <br />G217 <br />Potholing, two -man crew <br />$ <br />600.00 <br />Hour <br />Mix Design Review <br />Code <br />Item <br />$/Unit <br />Unit <br />D250 <br />Review of Concrete Mix Design <br />$ <br />168.00 <br />Each <br />D251 <br />Review of Grout Mix Design <br />$ <br />168.00 <br />Each <br />D252 <br />Review of Mortar Mix Design <br />$ <br />168.00 <br />Each <br />D253 <br />Review of Asphalt Mix Design <br />$ <br />210.00 <br />Each <br />Sample <br />Pick-Up/Hold <br />Code <br />Item <br />$/Unit <br />Unit <br />All hold samples are charged at the same rate as the testing rate <br />U303 <br />Technician for5pecimen pick up, minimum 2 hours <br />$ <br />120.00 <br />Hour <br />U304 <br />Vehicle (Up to 100 miles) <br />$ <br />75.00 <br />Trip <br />Field Equipment Charges <br />Code <br />Item <br />$/Unit <br />Unit <br />E350 <br />Brass Mold <br />$ <br />21.00 <br />Each <br />E351 <br />Concrete Air Meter <br />$ <br />53.00 <br />Day <br />E352 <br />Concrete Unit Weight (Scale, Bucket, Rod and Mallet) <br />$ <br />32.00 <br />Day <br />E353 <br />Field Vehicle Usage (Up to 100 miles) <br />$ <br />74.00 <br />Trip <br />E354 <br />Concrete/Asphalt Coring Equipment rental (min 4 hrs and 8 hrs after) <br />$ <br />200.00 <br />Hour <br />E355 <br />Fireproofing Adhesion/Cohesion <br />$ <br />21.00 <br />Test <br />E356 <br />Hand Auger Equipment <br />$ <br />131.00 <br />Day <br />E357 <br />Level D Personal Protective Equipment (PPE), per person <br />$ <br />42.00 <br />Day <br />