Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
ACCOUNT UNIT ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />New or Total Rewire for Single Family Dwellings: <br />51603 199)SFD (per square foot)sq. ft.0.17 0.18 <br />51603 200)Garage (per square foot)sq. ft.0.17 0.18 <br />51603 201)Temporary Electrical Service, Prior to approval or Each Meter 272.17 283.33 <br />Occupancy (30 Days) <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />Mechanical Fees <br />51604 202)Permit Issuance Fee 61.38 63.90 <br />51604 203)Minimum Fee (Nonresidential)81.83 85.19 <br />53603 204)Stand Alone Mechanical Plan Check 65% of Subtotal 65% of Subtotal <br />Furnace including ducts & vents (each) <br />51604 205)Up to 100,000 BTU 73.13 76.13 <br />51604 206)Over 100,000 BTU 104.35 108.63 <br />51604 207)Furnace/Compressor Combo (Residential)141.49 147.29 <br />Each Compressor, Boiler or Heat Pump (packaged or split system) <br />51604 208)Up to 5 HP 100.57 104.69 <br />51604 209)Over 5 to 30 HP 120.26 125.19 <br />51604 210)Over 30 to 50 HP 150.32 156.48 <br />Page 71 of 148