Laserfiche WebLink
Proposal to provide <br />On -Call landscape Architectural Services — RFP No. 22-097 <br />Proposed Team <br />DEA has worked on numerous on -call or flexible <br />services contracts since our founding in 1976. <br />We understand that these types of contracts are <br />utilized to assist our clients during times when they <br />are unable to have their in-house staff perform on <br />projects due to too many projects and not enough <br />staffing. <br />DEA's project manager and landscape architecture <br />team have experience delivering award -winning <br />parks for the City of Santa Ana <br />DEA further understands that projects issued as part of an on -call contract could involve partnering with other <br />firms or other disciplines to respond to the specific needs of a project. We regularly respond in this capacity, <br />whether teaming in-house with our staff, or by participating on other design teams to supplement their services <br />and abilities. DENS team is flexible with overlapping capacity through subconsultants to further allow us to <br />draw from a greater base of knowledge and talent, should that become necessary. <br />For this contract, our team includes Heath Habig, PLA as project manager and Kim Rhodes, PLA as <br />principal in charge. Assisting them will be a team of landscape architects, park planners, designers, <br />irrigation specialists, civil engineers, and surveyors from DEA. <br />DEA knows that the nature of an on -call contract is that they are variable, requiring a broad-spectrum of <br />professional services for upcoming, unknown projects on indeterminate time frames. Part of the popularity of <br />these contracts is the ability to draw on any practice at a moment's notice and have confidence in the cost- <br />effectiveness and quality of the consultant's product. DEA is familiar with this type of work, managing nearly <br />100 on -call contracts firmwide annually. We enjoy the relationships that can develop over long-term contracts <br />such as these, and the variety of projects that may result. <br />As with any on -call services contracts, we understand that the workload will vary throughout the life of the <br />contract. We are committed to providing the necessary staff resources to assigned projects on an as -needed <br />basis. The current and projected obligations of key team members will be evaluated in comparison to the <br />potential demands of projects assigned by the City of Santa Ana. The schedules for projects assigned under <br />this contract will be incorporated with staff at the beginning of the contract and at monthly intervals, to avoid <br />workload conflicts and to allow proposed staff to be available to complete the projects. Our goal is to identify <br />potential workload conflicts before they occur and resolve them against the critical paths of our client's projects <br />to make certain staff are available when needed. <br />Memory Lane Park <br />Mariposa Park <br />4 1 March 15, 2023 1 David Evans and Associates, Inc. <br />