Laserfiche WebLink
SECTION 1 I Statement ofQualijicntions <br />` 1Ci <br />8` ARW <br />ORTEGA PARK <br />MASTER PLAN <br />SANTA BARBARA, CA <br />NOTABLE INFO & STATS: <br />Client: City oJSanta Barbara <br />Project Timeline: 201 R-Current <br />Project Size: 10 Acres <br />RRM SERVICES PROVIDED: <br />Landscape Architecture, Architecture, IN <br />Eik(lineerigq, Survel,in,y <br />0 <br />RRM Design Group prepared a master plan for this <br />10-acre park renovation in the east end of the City of <br />Santa Barbara, a mixed -use neighborhood of residential, <br />commercial, and light industrial. The master plan process <br />included an extensive public outreach process that included <br />multiple workshops, stakeholder meetings, and online <br />community surveys —capturing hundreds of points of input <br />from park users and neighbors. The public input led to <br />a design that is intended to activate the park seven -days <br />per week to improve park safety and reclaim the space <br />for families. The final plan includes on -street perimeter <br />parking, a non-competitive swim center, a skate park, multi - <br />generational zone with durable game tables, corn hole, <br />bocce ball and basketball. The park features a synthetic, and <br />a multi -use sport field. The major spaces are tied together <br />with pedestrian promenades, play areas, picnic areas, and <br />expressions of public art. <br />12 nirrm <br />