My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRM DESIGN GROUP, INC.
Clerk
>
Contracts / Agreements
>
R
>
RRM DESIGN GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:26:37 PM
Creation date
6/13/2023 8:31:41 AM
Metadata
Fields
Template:
Contracts
Company Name
RRM DESIGN GROUP, INC.
Contract #
A-2023-089-08
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
6/30/2023
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Award ol Engineering <br />Excellence Atvnrdc l <br />MONTEREY BAY <br />SANCTUARY SCENIC TRAIL AND <br />SEGMENT 7 RAIL TRAIL <br />SANTA CRUZ. CA <br />NOTABLE INFO & STATS: <br />Client: Santa Cruz County Regional <br />Transportation COMIMWSian <br />(Segment 7 - Client: City of Sonta Cruz) <br />Project Timeline: 2011-Current <br />RRM SERVICES PROVIDED: <br />Civil Engineering, Trail Planning, <br />Landscape Architecture, Mupping, and <br />Public Outreach <br />Outstmldiny Plan Award <br />Assoeranon o(Enit,u, rental Projessmnals <br />rl,l <br />a <br />,.ML?h/i' ln,vu .1 omulrpcationx I SECTION 1 <br />RRM Design Group is leading an effort on behalf of the <br />Santa Cruz County Regional Transportation Commission to <br />develop a braided trail network with the rail corridor serving <br />as a continuous multi -use trail spine to provide alternative <br />transportation and coastal access along Santa Cruz County's <br />40-mile-long coast. Implementation of this key transportation <br />corridor will allow greater transportation options to more <br />than 80 parks, 25 schools and over half of the county's <br />population who live within one mile of the corridor. RRM <br />is currently preparing construction documents for the 2.2- <br />mile long segment that runs through the City of Santa Cruz <br />and includes twelve (12) at -grade trail crossings, pedestrian <br />and bike bridges, extensive retaining walls, and flood control <br />facilities. <br />1qq <br />l cun't spear highl}r enough about RRM <br />Design Group. The}, ore literally the best <br />consulting firm 1 have ever worked with. <br />Cnrl'r".olem, F�nne, Senwr'Traawl.... mi Plonner: <br />Itrgumal 7rampurtar, nn Cn,nrnusnm of SWIta cru; t.auntr <br />it <br />City ol5onta Ann I PROPOSAL FOR ON -CALL LANDSCAPE ARCHITECTURAL SERVICES <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.