My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TOWILL, INC.
Clerk
>
Contracts / Agreements
>
T
>
TOWILL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:19:50 AM
Creation date
6/16/2023 3:43:27 PM
Metadata
Fields
Template:
Contracts
Company Name
TOWILL, INC.
Contract #
A-2023-072-03
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
5/1/2026
Insurance Exp Date
6/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drawing on the City of Santa Ana website listed in item K below. <br />G. All survey needs to be prepared to the satisfaction of the City's Surveyor and meet the <br />following standards: <br />H. Horizontal control shall be based on the 1983 North American Datum (NAD83), tied to a <br />minimum of two proximate County of Orange, CCS83, Zone VI, 1991.35 Epoch <br />Adjustment control points. Project coordinate values shall be provided in U.S. Survey <br />Feet. The County control points shall determine the Basis of Bearing for the project. <br />L Vertical control shall be based on the North American Vertical Datum of 1988 (NAVD88), <br />tied to a minimum of two proximate County of Orange bench marks. Project elevations <br />shall be provided in U.S. Survey Feet. <br />J. Horizontal alignment(s) for the project shall be tied to the survey centerline monuments <br />within the project area. <br />K. With the coordinate values, a full location and detailed description, including point <br />character with reference(s), shall be provided for all found and set monuments for the <br />project. For this purpose, a sketch of the control network is required. <br />L. Copies of all survey field notes and raw data files shall be provided along with a listing of <br />the final coordinates for all surveyed points. The digital file format for the listing shall <br />be: point number, northing, casting, elevation, description (comma delineated with no <br />spaces, one point per line). The coordinate precision shall be one hundredth of a foot. <br />M. At any given time the City may need to mobilize survey crews to different project sites, <br />the consultant shall have a minimum of three (3) survey crews for mobilization. <br />N. All City CADD standards as well as Microstation configuration files are located at: <br />http://www.santa-ana.org/owa/EngineeringServices.asp <br />Other Terms and Conditions: <br />1. The project will be implemented in compliance with the City of Santa Ana's policies, as well <br />as Prevailing Wages and State/Federal Requirements. <br />2. The City regards the inclusion of California based designs, engineering, and construction <br />professionals, facilities, and services as part of the Team to be highly desirable, but not <br />mandatory. <br />3. The City reserves the right to amend this Request for Proposal by addendum prior to the final <br />dates of submission. <br />4. All reports, proposals, or other data or materials which are submitted shall become the sole <br />property of the City of Santa Ana with the exception of the confidential Financial Capacity <br />information and sealed fee proposals which will be returned to all proposers after award of <br />City of Santa Ana RFP 19-090 <br />PageAl-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.