My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COLOR-AD, INC.
Clerk
>
Contracts / Agreements
>
C
>
COLOR-AD, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 7:44:24 AM
Creation date
6/16/2023 4:10:41 PM
Metadata
Fields
Template:
Contracts
Company Name
COLOR-AD, INC.
Contract #
A-2023-095
Agency
Parks, Recreation, & Community Services
Council Approval Date
6/6/2023
Expiration Date
6/6/2026
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reich&Petch / Color -Ad <br />2.1 Participate in team meetings <br />Task: Host bi-weekly team meetings, virtual: Plan topics, agendas, prep materials, upload meeting <br />notes, documents. <br />2.2 Develop Detailed Design, Graphics, Technical Specs <br />Task: Design development & details for all aspects agreed design (exhibits, graphics, media, tech, <br />finishes). <br />2.3 Prepare Detailed Design documentation (FINAL) <br />Task: Prepare / deliver final design development package linking concepts, themes, messages and <br />design. <br />2.4 Finalize all Text and Content (FINAL) <br />Task: Prepare final complete script package for client approval and inclusion in final design <br />documentation. All images are sourced and purchased for use in the final exhibit. <br />Suggestions / Special Concerns <br />Final text development and approval is critical to the timeliness of the project. We anticipate the <br />EcoCenter's curatorial/visitor engagement team is required for the finalization and approval of all <br />text prior to hand-off to graphics. Timely and collaborative discussions will be critical at this stage and <br />requires staff resources. <br />PHASE 3: FABRICATION AND PRODUCTION <br />The goals & objectives for Phase 3 activities are confirmed as follows: <br />'The CAD Team" will provide detailing, shop drawings, and fabrication services according to the agreed <br />design developed with the EcoCenter team. <br />Our design/fabrication team will move the project into fabrication as follows: <br />► Wewill provide complete fabrication of all displays and exhibitfeatures including exhibits, graphics, <br />hands-on exhibits and media production (budget pending). We will provide graphic design <br />production organized by various exhibit zones. We will provide graphic artwork for the script <br />elements. We will provide material selections that consider environmental impact, durability and <br />ease of maintenance and replaceability. We will provide operation and maintenance information <br />and product sources information for replacements. <br />In the Fabrication phase "The CAD Team" will evolve the design into the technical details and logistics <br />for fabrication. We will continue to work closelywith the EcoCenter project team to discuss and review <br />project details and progress. Following is a brief overview of the process of this phase. All efforts will <br />be made during fabrication to minimize material waste by suggesting alternative sizing of exhibit <br />elements to maximize materials. <br />Virtual bi-weekly calls & provide monthly progress reports <br />We will host/ facilitate regular on-line workshops and conference calls as means to review in -progress <br />fabrication details including exhibits, graphics and media. <br />R <br />38 Reich&fetch SIGNS AND EXHIBITS <br />
The URL can be used to link to this page
Your browser does not support the video tag.