My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN (6)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:02:52 PM
Creation date
6/26/2023 3:42:30 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN
Contract #
A-2023-088-01
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant shall perform engineering design services resulting in contract documents <br />(plans, specifications and cost estimates "PS&E") for various projects on an as -needed basis. <br />However, work tasks may include studies or a variety of engineering tasks. If requested by <br />the City, the Consultant shall provide a Work Plan which includes a detailed schedule of the <br />assigned project prior to the issuance of Notice to Proceed and/or Task Order. Specific Task <br />Orders with Notices to Proceed ("NTPs") will be provided for project(s) at the discretion of <br />the City. Work required per Task Order shall comply with the Scope of Services and <br />additional provisions in each Task Order and this agreement. <br />A... <br />The following services/items shall include but are not be limited to: <br />1. Research existing records of utility companies and agencies and coordinate the proposed <br />improvements with existing field conditions, <br />2. Conduct an environmental assessment for each project and prepare all documentation <br />required to comply with California Environmental Quality Act (CEQA), and or National <br />Environmental Protection Act (NEPA), (If required) <br />3. Provide all field survey and topographic work necessary to complete the design effort. <br />Design level survey and base mapping of the project site shall be prepared in US Customary <br />English units by a California licensed Land Surveyor in accordance with the City guidelines <br />and in Microstation V8i Computer Aided Design and Drafting (CADD) format. The <br />horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. All survey <br />field notes shall be on forms provided by the City, shall be neatly completed in pencil, and <br />shall become property of the City upon completion of the project. Informal field <br />investigations including marking of removal areas may be required for some of the sidewalk, <br />curb and gutter, and pavement replacement projects. <br />4. Complete the design of projects including plans, specifications, and engineer's construction <br />cost estimate. The Consultant shall contact manufacturers and/or contractors to verify the <br />engineer's estimate prior to submitting to the City. Specifications shall be prepared in <br />Microsoft Word and an electronic copy of the final version shall be fiurnished to the City. <br />The City will provide the specification boilerplate to the Consultant. <br />5. If requested, all preliminary and bid sets of plans shall be plotted on bond or velum paper <br />using Microstation V8i CADD software program. All drawings shall be completed per the <br />City of Santa Ana CADD Standards and any special provisions thereof. For interim <br />submittals, the City may opt to receive only PDF versions of the plans for reviewing purposes. <br />If so, the Consultant team will provide plans and/or specifications accordingly. <br />6. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be <br />signed and stamped by the Consultant's licensed professional engineer responsible/in-charge <br />of the project. <br />City of Santa Ana RFP 23-030 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.