Laserfiche WebLink
(1 PROPOSALFOR <br />RFP NO 23-030 <br />Crown Valley Main Replacement <br />9,600 <br />12" <br />—Oct 2022 <br />Cole St, 5th St, Florence Ave, Semolina & Melva St <br />7,000 <br />8"-12" <br />2021-Current <br />1951 Cohort Pipeline Replacement <br />22,100 <br />6"-16" <br />Current <br />La Palma Ave and Tustin Ave Water Main <br />Replacement at Railway Crossing <br />600 <br />12"-36" <br />2021 <br />Water Main Replacement (3 projects) .. <br />24,700 <br />8"-12" <br />2020 - 2021 <br />Water Main Replacement (Annual) <br />150,000 <br />8" <br />2002 - 2019 <br />La Mirada Recycled Water Pipeline <br />28,700 <br />4"-20" <br />2018 <br />Katella Ave. Water Main Replacement <br />7,000 <br />12"-16" <br />2017 <br />Water Main Replacement (5 projects) <br />50,000 <br />8"-12' <br />2007 - 2017 <br />Phase IIB Package 3 RW <br />20,000 <br />4"-12" <br />2007 - 2017 <br />Recycled Water Expansion <br />127,700 <br />4"-24" <br />2016 <br />Newport Blvd. Water Main Replacement <br />5,300 <br />8"-24" <br />2016 <br />Peters Canyon Channel Reuse Pipeline <br />17,000 <br />10%16" <br />2016 <br />D- <br />Crown Valley Force Main Replacement <br />9,400 <br />12" <br />Oct 2022 <br />Regional Lift Station Force Main Replacement <br />16,000 <br />24" <br />2020 <br />Gisler-Redhill <br />3,600 <br />21"-33" <br />2015 <br />SARI and Yorba Linda Spur <br />25,500 <br />15" & 54" <br />2013 <br />Orange/Del Amo/15thStreet <br />5,200 <br />8"-15" <br />2013 <br />Sewer Improvement Project <br />3,700 <br />10" & 12" <br />2013 <br />Westminster Avenue & McFadden Sewer <br />4,900 <br />12"-15" <br />2013 <br />Broadway Phase 3 Relining <br />3,000 <br />14" & 18" <br />2009 <br />Westminster Ave. and Beach Blvd. Siphon <br />5 IN THE LAST 15 YEARS) <br />3,000 <br />8" & 15" <br />2009 <br />SA-7 Relocation <br />2021 <br />Carlsbad Conveyance FCF <br />2016 <br />SA-4 and SA-5 <br />2016 <br />Relocation of Zone 1 FCF <br />2012 <br />Kraemer Basin Valve Vault <br />2012 <br />Sand Canyon PRS <br />2009 <br />Santiago Pump Station Modification <br />2022 <br />Timber Ridge Booster Pump Station Replacement <br />2021 <br />Zone 8 to 9 Booster Pump Station <br />2021 <br />Elizabeth Booster Pump Station <br />2016 <br />Peters Canyon Channel Revise Pump Facilities <br />2016 <br />City of Santa Ana <br />71 <br />