My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH (3)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 4:12:53 PM
Creation date
6/26/2023 3:49:13 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH
Contract #
A-2023-088-02
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023 <br />HOURLY CHARGE RATE AND EXPENSE <br />Project Management <br />Project Manager 1 <br />Project Manager 2 <br />Sr Project Manager <br />Program Manager <br />Principal in Charge <br />Engineers <br />Engineering Technician <br />Engineer 1 <br />Engineer 2 <br />Engineer 3 <br />Project Engineer 1 <br />Project Engineer 2 <br />Sr Engineer 1 <br />Sr Engineer 2 <br />Sr Engineer 3 <br />Principal Engineer <br />Planners <br />Planner 1 <br />Planner 2 <br />Sr Planner 1 <br />Sr Planner 2 <br />Sr Planner 3 <br />Designers & Technicians <br />CAD Technician 1 <br />CAD Technician 2 <br />CAD Technician 3 <br />CAD Designer <br />Sr CAD Designer 1 <br />Sr CAD Designer 2 <br />CAD Director <br />Survey Tech 1 <br />Office Survey <br />Survey Technician 1 <br />Survey Technician 2 <br />Survey Crew Chief <br />Project Surveyor 1 <br />Project Surveyor 2 <br />Senior Land Surveyor <br />Field Survey <br />One -Man Crew (Non -Prevailing) <br />Two -Man Crew (Non -Prevailing) <br />Three -Man Crew (Non -Prevailing) <br />One -Man Crew (Prevailing) <br />Two -Man Crew (Prevailing) <br />Three -Man Crew (Prevailing) <br />SCHEDULE <br />Aerial Survey <br />$210.00 <br />Principal Photqgrammetrist <br />$260.00 <br />Staff Photggrammetrist <br />$300.00 <br />$350.00 <br />Health & Safety <br />$350.00 <br />H&S Administrator <br />Sr H&S Administrator <br />H&S Manager <br />$80.00 <br />$110.00 <br />Construction <br />$125.00 <br />Construction Project Rep 1 <br />$140.00 <br />Construction Project Rep 2 <br />$160.00 <br />Sr Constr Project Rep 1 <br />$180.00 <br />Sr Constr Project Rep 2 <br />$190.00 <br />Construction Manager 1 <br />$200.00 <br />Construction Manager <br />$220.00 <br />Construction Director <br />$300.00 <br />General & Administrative <br />Project Assistant 1 <br />$105.00 <br />Project Assistant <br />$115.00 <br />Project Administrator <br />$125.00 <br />Sr Project Administrator <br />$150.00 <br />Sr. Graphic Artist <br />$175.00 <br />Technical Writer <br />Technical Writer 2 <br />Sr Technical Writer <br />$65.00 <br />$75.00 <br />$90.00 <br />$100.00 <br />$135.00 <br />$145.00 <br />$150.00 <br />$50.00 <br />$105.00 <br />$120.00 <br />$130.00 <br />$150.00 <br />$165.00 <br />$210.00 <br />$175.00 <br />$255.00 <br />$335.00 <br />$205.00 <br />$340.00 <br />$466.00 <br />Information Technology <br />Systems Analyst / Programmer 1 <br />Systems Analyst / Programmer 2 <br />Sr Sys Analyst / Programmer 1 <br />Sr Systems Analyst / Programmer e' <br />Project Accounting <br />Project Analyst 1 <br />Project Analyst 2 <br />Sr Project Analyst <br />Reimbursable In -House Costs: <br />Photo Copies (B&W 8.5"xl1") <br />Photo Copies (B&W 11"xl7") <br />Color Copies (up to 8.51'xl1") <br />Color Copies (to 11"xl7") <br />Compact Discs <br />Large format copies <br />$165.00 <br />$115.00 <br />$95.00 <br />$115.00 <br />$145.00 <br />$78.00 <br />$85.00 <br />$100.00 <br />$116.00 <br />$165.00 <br />$185.00 <br />$233.00 <br />$70.00 <br />$75.00 <br />$95.00 <br />$130.00 <br />$150.00 <br />$97.00 <br />$124.00 <br />$155.00 <br />$77.00 <br />$115.00 <br />$130.00 <br />$196.00 <br />$90.00 <br />$114.00 <br />$155.00 <br />$ 0.15/Each <br />$ 0.40/Each <br />$ 2.00/Each <br />$ 3.00/Each <br />$10/each <br />$0.40 S.F. <br />Mileage -Company Vehicle $0.80/mile <br />Mileage-POV $0.55/mile* <br />*current GSA POV mileage rate subject to change <br />All other direct costs, such as production, special photography, postage, delivery services, overnight mail, and <br />printing will be billed at cost plus 15%. All services performed by subconsultant will be billed at cost (no markup). <br />F <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.