Laserfiche WebLink
CARL TAYLOR, PE, LEED AP <br />Civil Engineer - Huiit- ZOIIarS <br />Carl Taylor has a strong background in public infrastructure projects. He has worked on arterial <br />highways and intersections, local and neighborhood streets, master plan and local storm drains, city and <br />community parks, trails, streetscapes, vehicular and pedestrian bridges, city halls, libraries, community <br />centers, memorials and plazas, parking lots, sewer and water facilities, and pedestrian and bicycle/ <br />pedestrian trails. During his professional career, Taylor has provided plans, specifications, estimates, and <br />construction administration and support for numerous city, county, redevelopment agency, federal, and <br />community facilities district projects. <br />RELEVANT PROJECT EXPERIENCE <br />OC Parks On -Call Projects —Orange County, CA <br />» Mathis Trail Repair, Aliso & Wood Canyons » <br />» Creek Restoration, Wagon Wheel Regional Park <br />» General Development Plan, OC Zoo » <br />» Santiago Creekbank Repair at Arden Modjeska <br />» Historic Site, Modjeska Canyon Nature Preserve » <br />» Tijeras Creek Trail Repair, O'Neill Regional Park <br />» Trail Crossing Replacement, Santiago Oaks Regional» <br />Park <br />Wagon Wheel Creek Restorations, Thomas F Riley » <br />Wilderness Park <br />FEMA Repairs, Carbon Canyon <br />Regional Park <br />FEMA Repairs, Limestone / Whiting <br />Ranch Wilderness Park <br />FEMA Repairs, Upper Newport Bay <br />Nature Preserve <br />FEMA Repairs, Laguna Coast <br />Wilderness Park <br />Bakersfield National Cemetery <br />Oso Parkway & Antonio Parkway Intersection Improvements — Orange County, CA <br />La Pats Ave Gap Closure & Del Rio Extension — Orange County, CA <br />Sulphur Creek (Drainage Facility J03) — Laguna Niguel, CA <br />Design -Build of Riverside National Cemetery Phase V — Riverside, CA <br />Homo DetentionMater Quality Basin — Orange County, CA <br />JOHNNY MURAD, PE, MS, QSD <br />Utility Design - Huitt-Zollars <br />Johnny Murad brings 26 years of experience in civil engineering consulting. He has assisted numerous <br />clients in site selections, feasibility studies, preliminary construction cost estimates, earthwork estimates, <br />plan check and permit fee estimates, conceptual site planning, final design, and construction administration. <br />His experience gives him a good understanding of project costing techniques and calculations, which can <br />help keep the project cost at a minimum without losing efficiency and, thereby, help his clients stay within <br />their planned project budget and maintain their strength in the market. <br />RELEVANT PROJECT EXPERIENCE <br />Alder Avenue, Casa Grande Drive, Summit Avenue, and Mango Avenue Sewer Improvements — <br />Rialto, CA <br />Redlands Boulevard Sewer Improvements — Moreno Valley, CA <br />Brodiaea Avenue, Cactus Avenue, Joy Street, Gilbert Street, Rebecca Street, Frederick Street, <br />and Heacock Street Sewer Improvements — Moreno Valley, CA <br />San Bernardino Avenue Sewer Improvements— San Bernardino, CA <br />City of Rialto, Tract No.16304 Sewer Improvements — Rialto, CA <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />