My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 9:41:17 AM
Creation date
6/26/2023 3:50:56 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT ZOLLARS, INC.
Contract #
A-2023-088-03
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HLA HTUN, PE, PHD <br />Hydrology & Hydraulics Engineer - Huitt- Zollars <br />Dr. Htun is a Professional Engineer with more than 10 years of experience specializing in surface water <br />modeling, hydraulic design, and water resource management. Currently, he conducts hydrological <br />and hydraulic studies for urban development. He designs and analyzes energy dissipators for a major <br />arterial highway improvement against downstream erosion. He designs Low Impact Developments for <br />flood control and hydrologic condition of concern while preparing the Water Quality Monitoring Report, <br />Drainage Report, and Stormwater Pollution Prevention Plan <br />RELEVANT PROJECT EXPERIENCE <br />East Los Angeles College East and Corporate Stormwater — Monterey Park, CA <br />Gyp ess Ave & Foothill Blvd Storm Drain and Street Improvements — Fontana, CA <br />Pine Avenue Extension — City of Chino, CA <br />"F" Street PS&E — Rancho Mission Viejo, CA <br />JOHN KLUBER, PE, LEED AP, , <br />Mechanical Engineer - Huitt-Zollars <br />John Kluber is Vice President for Huitt-Zollars. Kluber has over 30 years of industry experience in <br />numerous educational, industrial, healthcare, and government projects. He has been involved in all <br />phases of design from programming through preparation of construction documents. He has been <br />FOR and project manager for numerous renovation projects for healthcare, mission -critical facilities, <br />and institutions that are fully occupied and operate 24/71365. He understands the complexities of <br />maintaining and operating building systems for fully occupied buildings while making modifications and <br />incorporates them into his design approach. <br />RELEVANT PROJECT EXPERIENCE <br />Water Tank Replacement at LA Co. Fire Camp No. 9 — Los Angeles, CA <br />Public Safety Building Facility Assessment— Lancaster, CA <br />UT Southwestern Medical Center Zale Lipshy Pavilion Chilled Water Study— Dallas, TX <br />UT Southwestern Medical Center NE Building — Fort Worth, TX <br />UT Southwestern Medical Center NE2.416B Replacement PET CT — Dallas, TX <br />UNIT Discovery Park MEP Upgrades— Denton, TX <br />Children's Health Sleep Center— Dallas, TX <br />CapMetro Bus Elect. Ph. 2 - North Ops — Austin, TX <br />City of Denison Facility Condition Assessment— Denison, TX <br />LVWD • Feasibility Study for New Field — Clint, TX <br />Admin Bldg Air Handling Unit Replacement— Fort Worth, TX <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.