with third party purveyors to find feasible alignments for dry utility. The proposed alignment would be incorporated into a conflict exhibit <br />for evaluation. The coordination is limited to the street improvement design period. <br />Sub -Task J.8 Specifications — HZ will utilize City of Santa Ana standard bid specifications and/or the latest edition of the Standard <br />Specifications for Public Works Construction and edit them to fit the project requirements. <br />Sub -Task J.9 Estimates of Probable Cost— HZ will prepare estimates of probable cost for the proposed improvements. <br />Sub -Task J.10 Utility Plans — HZ will prepare utility plans this includes an option for potholes to investigate existing utility size and <br />depth. Further investigation will be necessary where record information is unreliable and thought to cause a conflict with proposed <br />improvements. Existing manholes will be dipped where possible to verify inverts and pipe size. Notices will be sent to impacted utility <br />companies and every effort will be made to resolve conflicts prior to 60% submittal. <br />Sub -Task J.11 Disposition Plans— Removals are limited to infrastructure within project limits <br />Sub -Task J.12 Water Well Rehabilitation Plan <br />Sub -Task J.13 Offsite Improvement Plans - Excluded <br />Typical Street Improvement set will include: <br />1. Title Sheet <br />2. Index Sheet <br />3. Disposition Plan <br />4. Street Improvement Plans (5 sheets) <br />5. Details & Typical Cross <br />Sections <br />6. Storm Drain Improvements (2 sheets) <br />7. Drainage Details <br />8. Signing & Striping Plans (3 sheets -double stacked) <br />TASK K: Construction Administration Services (Optional) <br />9. Signing & Striping Details <br />10. Sound Wall Plan - (3 sheets) <br />11. Sound Wall Details <br />12. Streetlight Plan (3 sheets double stacked) <br />13. Streetlight Details <br />14. Landscape & Irrigation Plan (3 sheets -double stacked) <br />15. Landscape & Irrigation Details <br />Sub -Task K.1 Bid Support — HZ will be available to attend the pre -bid meeting. Our team will review contractor's RFIs if requested <br />by the City during the bidding phase. <br />Sub -Task IC2 Construction Support — HZ will participate in construction meetings if necessary. HZ will review submittals and shop <br />drawings required to support the construction contract. Reviews will be completed within 10 working days of receipt. Contractor change <br />orders will be completed within two working days of receipt. HZ will be available as requested by the City to resolve discrepancies in <br />contract documents. HZ will furnish necessary revisions to documents due to errors and/or omission at no cost. <br />Sub -Task K.3 Record Drawings — The contractor shall provide as -built redlines, HZ will revise approved plans per contractor <br />comments to produce record drawings. <br />Sub -Task K.4 Project Close -Out - HZ will assist in the development of the project punch list as related to the construction package <br />prepared by our team. <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />14 <br />