My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (6)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:59 PM
Creation date
6/26/2023 3:55:45 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-088-06
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/2/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 14, 2023 Balancing the Natural and Built Environment <br />Submitted electronically via PlanetBids <br />and provided five hard copies <br />Sean Thomas, Project Manager <br />City of Santa Ana, Public Works Agency <br />20 Civic Center Plaza, M-36 (per RFQ) or M-26 (per PlanetBids) <br />Santa Ana, CA 92701 <br />Subject: Proposal for On -Call Civil Engineering Services, RFP No. 23-030 <br />Dear Mr. Thomas: <br />Psomas is providing for your review and consideration our proposal for On -Call Engineering Services. <br />Our project team has reviewed the RFP and understands the City of Santa Ana is looking for qualified <br />firms to assist them in providing the necessary civil engineering design services on an as -needed <br />basis. Therefore, Psomas has assembled a project team of highly qualified professionals who are <br />experts in their fields. <br />Leading the team is Project Manager, Maira Salcedo, PE, ENV SP, who will also serve as the City's <br />primary point of contact for the duration of this contract. Mail relevant project experience includes <br />serving as Project Manager for the City's Well 29 Rehabilitation project and the Walnut Pump Station <br />Upgrade project. In addition to her extensive water facility design experience, Mail has recent relevant <br />experience in water pipeline design and the rehabilitation of sewer mains. Mail qualifications include <br />training through the NASSCO PACP (Pipeline Assessment Certification Program) and MACP (Manhole <br />Assessment Certification Program), making her uniquely qualified to assess the condition of sewer <br />mains and manholes. <br />Supporting Maira is Matt Heideman, PE, QSD/QSP, ENV SP. Matt is an expert in all facets of civil <br />engineering design, including site design, drainage, roadways, and parks. <br />1.13. Contract Agreement Statement: Psomas has read the City of Santa Ana's Standard Agreement <br />and concurs with all provisions as contained in the Agreement provided in the Appendix section of the <br />RFP as Attachment 2. <br />As Principal -in -Charge and a Vice President of Psomas, I, Joseph Boyle, have the authority to <br />contractually bind the company. We consider the City of Santa Ana one of our top clients and look <br />forward to continuing to provide professional services that exceed your expectations. <br />Respectfully, <br />PSOMAS <br />Joseph L. Boyle, PE <br />Vice President <br />Maira Salcedo, PE, ENV SP <br />Project Manager/Primary Contact <br />5 HUTTON CENTRE DRIVE <br />SUITE 330 <br />SANTA ANA, CA 92707 <br />TEL 714.751.7373 <br />FAX 714.545.BB83 <br />W WW.PSOMAS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.